In the 2026 Malaysian mechanical sector, installing a New AC Drain Tray is a critical structural intervention to combat "The Sponge Effect." Under the Energy Efficiency and Conservation Act (EECA) 2024, a failing or corroded drain tray is the primary cause of moisture migration into the AHU Box insulation, leading to structural rot and high Building Energy Intensity (BEI).
At EKG (Malaysia) SDN BHD, we provide high-tensile, antimicrobial tray installations that transition your unit back into a dry, high-performance asset that satisfies DOSH (JKKP) 2026 hygiene standards.
A new tray must be engineered to withstand the acidic nature of condensate and the mechanical harmonics of the fan array.
G90 High-Tensile Steel: We utilize G90 galvanized steel or SS304 Stainless Steel for maximum cathodic protection against pitting and perforation.
Precision Axial Sloping: We utilize laser-guided leveling to ensure the new tray is installed with a perfect 1:50 slope toward the outlet. This eliminates the "Pooling Zones" where "The White Slime" (bio-films) thrives.
Thermal Decoupling: We install non-conductive polyamide spacers to decouple the tray from the AHU Base Frame. This eliminates the thermal bridge that causes "Casing Sweat" on the underside of the unit in KL's 90%+ humidity.
Installing a new, professionally engineered tray is a prerequisite for passing mandatory 2026 building health and energy audits.
DOSH 2026 (IAQ): Our trays are designed to be "Zero-Stagnation" basins, keeping indoor microbial counts below the statutory 1000 CFU/m³ limit.
SFP Efficiency (EECA 2024): By ensuring 100% moisture removal, we keep the unit's insulation dry. This maintains the design R-value and keeps your Specific Fan Power (SFP) within the statutory 1.6 kW/m³/s limit.
BOMBA 2026 (Fire Safety): All materials used, including the tray insulation and sealants, are certified Class 0 (BS 476 Part 6 & 7) for zero flame spread.
We follow a forensic mechanical workflow to ensure your new installation is both durable and audit-ready.
| Stage | Engineering Action | Performance Outcome |
| I: Forensic Dimensions Audit | 3D scanning of the internal plenum and drain outlet coordinates. | Ensures a perfect fit within the existing AHU Frame without air bypass. |
| II: Mechanical Prep | Removal of legacy tray and decontamination of the base structure. | Removes all legacy bio-films and prepares the foundation for the new tray. |
| III: Structural Integration | Installation of the new tray with Silver-Ion (Ag+) antimicrobial liners. | Re-establishes a seamless, 100% waterproof, and biologically inert basin. |
| IV: T&C Validation | Flood testing and drainage pitch verification under full fan load. | Provides the certified technical dossier required for your REM audit logs. |
To ensure the new tray survives the tropical climate, we integrate automated sentinels and advanced insulation.
Silver-Ion (Ag+) Passivation: The new tray is treated with antimicrobial agents that disrupt pathogen metabolism, preventing the bio-film blockages that cause overflows.
Fiber-Free Closed-Cell Insulation: We encase the underside of the tray in high-density, non-porous insulation. This ensures the tray itself cannot act as a "Sponge" for moisture.
Automatic High-Level Float Switches: We integrate industrial-grade switches that trigger an automated shutdown of the fan array if water levels rise due to downstream blockages.
Technical Integrity: We are mechanical and T&C specialists. We focus on the thermodynamic and structural stabilization of your assets through precision engineering.
Audit-Ready Reporting: Following every installation, we provide a Structural Integrity & Drainage Validation Report, essential for your annual building audits and ESG reporting.
GITA Sustainability: AHU tray replacement and moisture management are recognized "Green" interventions, qualifying for the 100% Green Investment Tax Allowance (GITA).
Is your AHU tray currently rusted, leaking, or holding stagnant water?
Lihat detail lebih lanjut tentang EKG M & E SDN BHD
Malaysia