PHARLAP is proud to announce the successful completion of a comprehensive Site Supervision and Installation Support project. This initiative focused on the critical deployment of 33kV XLPE Insulated Cable Joints for Malaysia’s national utility provider, Tenaga Nasional Berhad (TNB), utilizing industry-leading technology from TE Connectivity (TE).
Cable joint failure is a leading cause of power outages in medium voltage networks. To mitigate this risk, the PHARLAP technical team provides professional on-site supervision to ensure every TE Raychem installation follows the highest engineering standards. Our goal is simple: Zero Failure Architecture.
Compliance & Certification: We utilize high-performance TE Raychem CSJT (Cold Shrink Resin Joints). These solutions are fully backed by a valid Sijil Guna Pakai (SGP), confirming they meet TNB’s rigorous technical specifications.
Next-Generation Sealing: The TE Connectivity resin joints provided by PHARLAP offer superior sealing performance. The polyurethane-type resin is engineered for the same elasticity as the cable jacket, making it ideal for Malaysia’s demanding underground and water-immersion environments.
Professional Site Oversight: Our supervision ensures meticulous conductor preparation and joint body placement, preventing mechanical or electrical failures before they occur in the TNB Distribution Network.
In the energy sector, quality products are only half the solution. PHARLAP bridges the gap by providing TE Connectivity’s premium engineering together with the on-site expertise and Sijil Guna Pakai documentation required for successful TNB project delivery.
Engineering safe, reliable, and certified power connections for Malaysia.
Indonesia