Engineered, code-compliant systems for safe and reliable water removal.
MEP compliant condensate drainage installation involves designing and installing a complete system that meets mechanical, electrical, and plumbing codes, building standards, and health regulations. EKG Malaysia provides turnkey compliant solutions for commercial, industrial, and institutional projects, ensuring safety, hygiene, reliability, and seamless integration with other building services.
Core Compliance & Design Standards We Follow:
Local Building Codes: Adherence to Uniform Building By-Laws (UBBL), DBKL/MPAJ/MBJB requirements, and Suruhanjaya Tenaga electrical regulations.
Health & Safety: Design to prevent legionella and mold as per ASHRAE Guideline 12 and JKR/KKM standards.
Plumbing Standards: Compliance with MS 830 or equivalent for pipe sizing, materials, and venting.
Electrical Safety: Wiring according to IEC/ MS 1936 standards, with proper earthing and protection.
Our Comprehensive Installation Scope:
Hydraulic Design & Sizing:
Calculating condensate loads from all AHUs, FCUs, and dehumidifiers.
Sizing drainage pipes for adequate flow with proper slope (minimum 1:100).
Designing central collection sumps with appropriate capacity.
System Fabrication & Installation:
Installation of primary and secondary (emergency) drain pans with independent alarms.
Running UV-stabilized PVC/PP drainage networks with proper supports and cleanouts.
Installing P-traps with primer connections to maintain seal and prevent sewer gas ingress.
Integrating condensate pumps (inline or sump-based) with BMS alarm points.
Hygiene & Risk Mitigation:
Ensuring systems are self-draining without stagnant water pockets.
Specifying accessible cleanouts and anti-microbial treatments where required.
Implementing overflow protection and leak detection in critical areas.
Testing & Commissioning:
Water test all drainage lines for leaks and flow.
Verify pump automatic operation and alarm functions.
Provide as-built drawings, operation & maintenance (O&M) manuals, and compliance certificates.
Why Professional Compliance Matters:
Prevents Water Damage: Proper design avoids leaks and overflows that damage property.
Mitigates Health Risks: Correct traps and drainage prevent indoor air quality (IAQ) issues.
Ensures System Reliability: Reduces callbacks and maintenance issues.
Facilitates Approvals: Provides documentation for CCC (Certificate of Completion and Compliance) and green building certifications (GBI, LEED).
Don't leave drainage to chance.
A compliant installation is a permanent asset that protects your building and its occupants.
Contact EKG Malaysia for a compliant condensate drainage system design and installation. We engineer for safety, reliability, and code adherence from the ground up.
More detail about EKG M & E SDN. BHD.
Malaysia