Moving Air Handling Units

Moving Air Handling Units

Kategori: AHU Rigging & Mechanical Position Testing Tersedia
Untuk maklumat lanjut, lawati laman web rasmi kami di eakon.com.my

Penerangan

In the 2026 Malaysian engineering and regulatory environment, Moving Air Handling Units (AHUs)—whether for new installations, retrofits, or high-rise repositioning—is a high-precision operation. Under the Energy Efficiency and Conservation Act (EECA) 2024 and the latest DOSH (JKKP) safety amendments, any structural compromise during the move is a statutory liability.

At EKG (Malaysia) SDN BHD, we manage AHU movement as a coordinated technical event to ensure your assets remain Sterile, Silent, and Statutory-Compliant.


1. Statutory Compliance: The 2026 Lifting Framework

Since the full transition on June 1, 2024, all lifting and moving operations for heavy mechanical units must comply with the Certificate of Fitness (CF) framework.

 

2. Specialized Rigging for Mechanical Integrity

Commercial AHUs are sensitive machines. Improper moving techniques can "rack" the frame, causing air leakage—a primary form of "Energy Theft" in 2026.

Moving Technique Technical Requirement Purpose
Spreader Beam Lifting Certified beams matched to unit width. Ensures 100% vertical lift to prevent crushing the TB2 Thermal Break panels.
Sectional Rigging Modular transport for tight zones. Allows for moving high-capacity units through standard service lifts or narrow corridors.
Air Skates & Rollers High-load precision positioning. Used for floating units over finished plant room floors to their final plinth.
Synthetic Tag Lines Dual-point tethering. Manages unit orientation during "Path-of-Entry" in windy high-rise corridors.

3. High-Rise Logistics & Urban Management

Moving units to rooftops or upper mechanical floors in Kuala Lumpur requires specialized logistical coordination.


4. Post-Move Performance Validation

Under EECA 2024, moving a unit requires a re-validation of its performance.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU move a structural risk or a 2026-compliant asset? Contact EKG (Malaysia) SDN BHD today for a specialized AHU Moving & Positioning assessment.

Are you moving a new unit into a project, or are you looking to relocate an existing unit within a facility?

Lebih maklumat tentang EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD