Smoke Spill Fan AHU Integration

Smoke Spill Fan AHU Integration

Category: BOMBA Certified AHU Installation Available
For more information, visit our official website at eakon.com.my

Description

Smoke Spill Fan & AHU Integration: Statutory Standards 2026

In the 2026 Malaysian regulatory framework, the integration of Smoke Spill Fans and Air Handling Units (AHU) is a critical life-safety protocol. Governed by MS 1780:2017/2026 and the Uniform Building By-Laws (UBBL) 2026, the system must ensure that during a fire, comfort-cooling assets (AHUs) do not interfere with the active extraction of toxic smoke (Smoke Spill Fans).

At EKG (Malaysia) SDN BHD, we engineer this integration to ensure your building remains Sterile, Silent, and Statutory-Compliant.


1. The Statutory "Kill & Kick" Logic

The integration operates on a synchronized "Kill-Signal" and "Kick-Signal" protocol interlocked with the building's Fire Alarm Monitoring System (FAMS).


2. Engineering the Air-Path Integration

For the smoke spill fan to extract effectively, it often shares ductwork or plenums with the AHU system. This requires specialized hardware to maintain fire compartmentation.

Component Integration Requirement Engineering Purpose
Motorized Fire Dampers MS 558:2024 Certified Seals off the comfort ducting to focus 100% of the fan's suction on the fire zone.
Make-Up Air Interlock Motorized Louvers / Fans Automatically opens to introduce replacement air, preventing a vacuum that traps occupants.
Fire-Rated (FR) Cabling MS 2116 Class C Ensures the integration signals survive high-heat events during the fire.
High-Temp Fan Motor Class H (250°C for 120min) Ensures the spill fan continues to run while standard AHU motors are shut down.

3. Pressure Differential & Door Opening Forces

A common integration failure is creating a "vacuum effect." MS 1780 and MS 1472 specify that the smoke spill extraction must not make escape doors impossible to open.

 


4. Verification & Statutory Commissioning

To secure the building's Fire Certificate (FC), the integration must pass a physical witness test by a BOMBA officer:

  1. Smoke Visualization Test: Using non-toxic smoke bombs to verify the AHU stops recirculating and the spill fan successfully extracts the smoke.

  2. Damper Fail-Safe Audit: Verification that all motorized dampers revert to their required state (closed for AHU, open for Spill Fan) upon loss of mains power.

  3. Digital Twin Update: All integration logs and response times are uploaded to the building’s Digital Birth Certificate (LOD 500) for the mandatory 5-year periodic audit.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU and Smoke Spill integration safe enough to pass a 2026 statutory audit? Contact EKG (Malaysia) SDN BHD today for a specialized Integration Design Review & Commissioning Audit.

More detail about EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD
Contact Us flagMalaysia