MS 1525 -2024 Energy Efficient AHU

MS 1525 -2024 Energy Efficient AHU

Category: AHU Energy Retrofitting for EECA Compliance Available
For more information, visit our official website at eakon.com.my

Description

The MS 1525:2024 (Code of Practice on Energy Efficiency and the Use of Renewable Energy for Non-Residential Buildings) represents the latest Malaysian standard for sustainable building design. For Air Handling Units (AHUs), this standard serves as the technical backbone for the Energy Efficiency and Conservation Act (EECA) 2024 compliance.

Under MS 1525:2024, an AHU is no longer viewed as a standalone box but as a critical component of the building’s Energy Intensity (BEI). At EKG (Malaysia) SDN BHD, we align our retrofitting protocols with these updated parameters to ensure your assets are audit-ready for the 2026 regulatory cycle.


1. Key Technical Benchmarks in MS 1525:2024

The 2024 revision tightens several mechanical and thermodynamic thresholds that dictate how an AHU must be configured.

A. Specific Fan Power (SFP) Limits

MS 1525:2024 sets the maximum allowable electrical power for fans per unit of air moved.

B. Thermal Transmittance and Bridging

To minimize energy waste through the casing (and prevent "The Sponge Effect"), MS 1525 emphasizes the thermal integrity of the AHU enclosure.

C. Variable Speed Controls

The code mandates that any fan motor with a rated output of 5 kW or more must be equipped with variable speed control to allow for Demand Controlled Ventilation (DCV).


2. The EKG Compliance Roadmap for MS 1525:2024

We transition legacy AHUs into MS 1525:2024 compliant platforms through a 4-stage structural reset.

MS 1525 Parameter EKG Modernization Action Performance Outcome
Air Leakage Structural reinforcement to ATC 6 (Class L1). Eliminates "invisible energy theft" through panel seams.
Insulation Replacing fiberglass with Fiber-Free Closed-Cell cores. Maintains design R-value and prevents microbial growth.
Fan Efficiency Transitioning from belt-drive to Direct-Drive EC Fan Walls. Removes transmission losses and hits statutory SFP targets.
Control Logic Integration of NDIR $CO_2$ sensors and BMS syncing. Modulates airflow based on occupancy to slash $kWh$ waste.

3. Statutory Compliance and Incentives

Adhering to MS 1525:2024 is the primary mechanism for passing mandatory 2026 building audits in Malaysia.


4. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU inventory currently a compliance liability, or are you ready to transition to the high-performance MS 1525:2024 platform?

More detail about EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD
Contact Us flagMalaysia