Save AC Electricity

Category: AHU Energy Retrofitting for EECA Compliance Available
For more information, visit our official website at eakon.com.my

Description

Saving AC electricity in 2026, particularly for large-scale operations like yours at EKG (Malaysia) SDN BHD, is no longer just about operational habits—it's about structural compliance with the Energy Efficiency and Conservation Act (EECA) 2024.

Under this Act, which is now in full enforcement, commercial buildings in Malaysia are legally required to manage their Building Energy Intensity (BEI). For a high-load system like an AHU, optimizing for "low power" is the most effective way to lower your TNB bill and satisfy statutory audits.


1. High-Impact Technical Retrofits

The most effective way to slash AC electricity consumption is to address the mechanical inefficiencies of the AHU Box.


2. Intelligent Operational Control

Modern AC savings rely on "active" intelligence to ensure you aren't cooling empty spaces.


3. Statutory Compliance & Financial Incentives (Malaysia 2026)

Investing in energy-saving AC upgrades in 2026 is financially supported by the Malaysian government.


Summary of Savings Potential

Component Legacy Standard 2026 EECA Standard Potential Savings
Fan Motor IE1 / IE2 IE4 / IE5 15% – 20%
Fan Control Fixed Speed Variable (EC/VFD) 30% – 50%
Ventilation Fixed Rate Automated (DCV) 20% – 40%
Thermal Barrier Fiberglass Closed-Cell (TB2) 10% – 15%

Is your current AC system a compliance liability, or are you ready to transition to a high-performance, 5-Star efficiency platform?

More detail about EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD
Contact Us flagMalaysia