EVHUB EV DB Panel Box

EVHUB EV DB Panel Box

分类: CHARGER ACCESORIES 当前有货
可在官方网站购买
欲了解更多详情,请游览我们的官方网站 evhub.my

详情

EVHUB EV Charger Installation Safety Package

EVHUB EV DB Panel Box

Custom EV distribution board with RCBO Type A protection and full AC / DC leakage current trip testing.

EVHUB EV DB Panel Box is designed to improve the safety, reliability and maintainability of EV charger installations.

Instead of using a basic protection arrangement, the EVHUB installation package includes a custom EV distribution board, imported RCBO Type A, comprehensive AC and DC leakage current trip testing, and commissioning using high-end multi-function testers.

This approach helps reduce installation failure points, improves protection verification and gives the owner a safer and more serviceable EV charging installation.

Custom EV DB Panel See-Through Acrylic Cover Powder-Coated Metal Enclosure RCBO Type A AC Leakage Trip Test DC Leakage Trip Test Insulation Resistance Test Fluke / Megger MFT Testing

Product Application

The EVHUB EV DB Panel Box is used as the dedicated protection and distribution panel for EV charger installations.

It is suitable for residential EV charger installations, commercial EV charging points, office car parks, shop lots, factories, fleet parking areas and other EV charging locations where proper protection, testing and commissioning are required.

For EV charging, the DB panel is not just an accessory. It is part of the safety system that protects the charger, wiring and user.

For Your Safety, Our Charger Installation Includes

01

Custom EV Distribution Board

The custom-made metal EV DB is made from powder-coated steel and includes a see-through acrylic cover.

This allows periodic visual inspection to check whether cables show signs of overheating, discoloration or burn marks.

02

RCBO Type A Protection

The installation uses imported RCBO Type A protection for a neater arrangement and improved protection in the EV charger circuit.

This reduces dependence on separate RCCB and MCB combinations, which may create more connection points and potential failure points.

03

Comprehensive AC and DC Leakage Current Trip Test

The EV charger installation is fully tested and commissioned. Functionality and protection systems are verified before handover.

The trip testing confirms that electrical supply will disconnect correctly in the event of leakage current or protection failure conditions.

04

High-End MFT Testing

Commissioning is carried out using Fluke 1664FC or Megger 1741+ multi-function testers.

Tests include insulation resistance testing, AC leakage current trip testing and DC leakage current trip testing to support proper charger operation and user safety.

Why the EV DB Panel Box Matters

A

Better Visual Inspection

The transparent acrylic cover allows the user or service team to visually inspect the DB condition without opening the panel unnecessarily.

B

Reduced Failure Points

A properly selected RCBO Type A combines overload, short-circuit and residual current protection in one device, reducing wiring complexity.

C

Verified Protection

Testing confirms that the protection devices operate correctly during actual fault simulation, instead of relying only on visual installation checks.

D

Safer EV Charging

EV charging is a continuous high-current load. Proper DB design and testing help reduce electrical risk during daily charging.

E

Cleaner Installation

A dedicated EV DB gives the EV charger circuit a neater and more serviceable protection arrangement.

F

Commissioning Evidence

Use of professional MFT equipment supports proper commissioning records and installation quality control.

Testing and Commissioning Scope

The EVHUB EV charger installation package includes more than just mounting and energising the charger. The system is tested to verify proper functionality and protection operation.

Insulation Resistance Test

Checks the cable and circuit insulation condition before final handover.

AC Leakage Current Trip Test

Verifies that the residual current protection trips correctly under AC leakage current conditions.

DC Leakage Current Trip Test

Verifies protection response under DC leakage current conditions relevant to EV charging systems.

Protection System Verification

Confirms that the charger circuit protection operates correctly before user operation.

Charger Functionality Check

Checks charger operation, charging readiness and basic user functions before commissioning completion.

Installation Safety Review

Reviews DB condition, protection arrangement, cable routing and final installation quality.

Typical EVHUB EV DB Panel Box Scope

Panel Box Components

  • Custom metal EV distribution board
  • Powder-coated steel enclosure
  • See-through acrylic cover
  • Imported RCBO Type A
  • Dedicated EV charger protection circuit
  • Neat internal wiring and termination

Testing and Commissioning

  • EV charger functionality check
  • Protection system verification
  • Insulation resistance test
  • AC leakage current trip test
  • DC leakage current trip test
  • Testing using Fluke or Megger MFT

Is Your EV Charger Deployment the Same?

A proper EV charger installation should include dedicated protection, correct DB arrangement, trip testing and proper commissioning. Power-on alone is not enough.

Specification Summary

Item EVHUB EV DB Panel Box Description
Product Type Dedicated EV charger distribution board / EV DB panel box
Application EV charger power protection and distribution
Enclosure Custom metal EV DB made from powder-coated steel
Cover See-through acrylic cover for easier visual inspection
Protection Device Imported RCBO Type A
Testing Equipment Fluke 1664FC or Megger 1741+ multi-function tester
Commissioning Tests Insulation resistance test, AC leakage current trip test and DC leakage current trip test
Installation Focus Safety, protection verification, neat installation and reduced failure points

Suitable Applications

EV

Home EV Chargers

Suitable for dedicated residential EV charger circuits requiring proper protection and testing.

COM

Commercial EV Chargers

Suitable for offices, shop lots, commercial buildings and customer parking EV chargers.

FLT

Fleet EV Charging

Supports fleet parking areas where charger uptime and safe daily operation are important.

MALL

Car Parks

Useful for shared EV charging installations in commercial and public parking areas.

IND

Factories and Industrial Sites

Suitable for staff, visitor or operational EV charging points at industrial premises.

QA

Quality-Focused Installations

Suitable where the owner wants documented protection testing and better installation quality control.

Product Summary

EVHUB EV DB Panel Box is a safety-focused EV charger distribution board solution that supports better protection, easier inspection and more complete commissioning.

With a custom powder-coated metal DB, see-through acrylic cover, imported RCBO Type A, insulation resistance testing, AC and DC leakage current trip testing, and commissioning using Fluke / Megger multi-function testers, the EVHUB installation package is designed to deliver a safer and more reliable EV charger installation.

EVHUB EV DB Panel Box — Because EV Charger Safety Starts at the DB.

Contact us for EV charger installation, EV DB panel box supply, protection upgrade, testing and commissioning support.

更多 Saturn Pyro EV Sdn Bhd 相关资料
Saturn Pyro EV Sdn Bhd
Saturn Pyro EV Sdn Bhd Electric Car Charging Solution Malaysia, KL, EV Charger Supplier Selangor, Johor, Wallbox Charger Supply Penang, Melaka, Perak ~ Saturn Pyro EV Sdn Bhd