Double-Skin AHU Field Assembly

Double-Skin AHU Field Assembly

分类: Turnkey AHU Installation Services KL 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

Double-Skin AHU Field Assembly

In the 2026 engineering environment, Double-Skin AHU Field Assembly is a specialized procedure used when logistical constraints—such as narrow service lifts or tight corridors in established KL high-rises—prevent the delivery of a fully assembled unit. Under the Energy Efficiency and Conservation Act (EECA) 2024, a field-assembled unit must meet the same rigorous airtightness and thermal performance standards as a factory-built model to protect the building's Energy Intensity Label.

At EKG (Malaysia) SDN BHD, we utilize a "Modular-First" assembly protocol, ensuring that every panel and component is integrated with precision to maintain a sterile, silent, and ultra-efficient environment.


1. The Anatomy of a Double-Skin Panel

The "Double-Skin" design is the primary defense against thermal leakage and noise.


2. The Field Assembly Sequence

Field assembly requires a controlled environment and a "First-Time-Right" mechanical approach.

  1. Base Frame Leveling: The assembly starts with the installation and laser-leveling of the structural base frame on inertia pads or concrete plinths. This ensures the unit remains balanced and prevents stress on the IE5 Fan Wall.

  2. Modular Component Placement: Internal components—including the cooling coils, Total Enthalpy Recovery Wheel, and fan modules—are positioned onto the base frame according to the LOD 400 BIM layout.

  3. Panel Integration: The double-skin panels are fitted into the framework. We use high-integrity "tongue-and-groove" joints and EPDM gaskets to ensure an airtight seal.

  4. Sterile Sealing: All internal joints are sealed with pharmaceutical-grade, anti-fungal sealants to ensure the AHU remains a sterile source of air for the building.


3. Verification & Compliance (EECA 2024)

A field-assembled unit is only as good as its final verification. We perform onsite testing to prove the unit meets its design intent.

Verification Test Engineering Benchmark Purpose
Casing Leakage (DW/143) Class L1 or L2 Ensures no "energy theft" or unfiltered air bypass.
Thermal Bridging Test No condensation at $25^\circ\text$ / 90% RH Prevents "Sick Building Syndrome" in humid KL air.
SFP Verification $< 1.1\text{ kW/m}^3\text{/s}$ Mandatory for the Energy Commission (ST) audit.
Acoustic Mapping Verified NC levels Guarantees a silent, premium indoor environment.

4. Why Partner with EKG (Malaysia) SDN BHD?

Does your facility require a custom AHU assembly in a restricted space? Contact EKG (Malaysia) SDN BHD today. We specialize in Double-Skin AHU Field Assembly and advanced mechanical coordination.

Would you like to review the specific "Path of Entry" requirements for your mechanical room to see if a modular field assembly is the best solution for your upgrade?