BOMBA 2026 Certified Fire-Rated Ducting

BOMBA 2026 Certified Fire-Rated Ducting

Category: Commercial HVAC Ducting Installation Available
For more information, visit our official website at eakon.com.my

Description

BOMBA 2026 Certified Fire-Rated Ducting by EKG M&E Sdn Bhd

In the dense commercial and residential vertical landscapes of KL and Selangor, fire safety is a non-negotiable engineering requirement. EKG M&E Sdn Bhd provides BOMBA 2026 Certified Fire-Rated Ducting, specifically designed to maintain structural integrity and prevent the spread of smoke and flames through the building's ventilation shafts. This is a critical M&E component for ensuring that life-safety systems—such as smoke spill and staircase pressurization—remain operational during an emergency.

Engineering Selection by Application

We specify the fire-rating duration (e.g., 1-hour, 2-hour, or 4-hour) and coating type based on the fire zoning requirements of your facility.

1. Kitchen Exhaust Risers (Grease Fire Containment)

Kitchen ducts are high-risk zones due to accumulated grease which can act as fuel during a fire.

2. Smoke Spill and Smoke Extraction Systems

In the event of a fire, these ducts must "suck out" hot smoke to allow occupants to breathe and escape.

3. Staircase and Lift Lobby Pressurization

To keep escape routes clear, these systems pump fresh air into stairwells to create a "pressure curtain" against smoke.

Critical Installation and Integration

As a specialist M&E contractor, we ensure that the fire-rating is a continuous barrier, not just a label on the metal:

Fire Damper Integration:

Where fire-rated ducts pass through fire walls, we install BOMBA-approved Fire Dampers interlocked with the building's Fire Alarm Pillar (FAP). In the event of high heat, these dampers automatically trigger to seal the duct path, preventing the "chimney effect" of fire spreading between floors.

Specialized Fire-Stop Penetrations:

A fire-rated duct is only as good as its weakest link. We utilize specialized fire-stop pillows, sealants, and collars at every point where the ductwork passes through a masonry wall or concrete slab, restoring the fire-rating of the partition.

BOMBA Inspection and Certification:

Post-installation, we provide the necessary technical documentation and material certificates required for Jabatan Bomba dan Penyelamat Malaysia inspections. This ensures your building receives its Fire Certificate (FC) or CCC without delays.

Performance and Durability Matrix

Feature Standard Ventilation Ducting EKG BOMBA-Certified Fire Duct
Material Standard GI (Melts at high heat) Heavy-Gauge / Coated / Wrapped Steel
Fire Endurance 0 Minutes 60 / 120 / 240 Minutes
Smoke Leakage High risk during fire Zero-Leakage (Certified Integrity)
Coating Type None Intumescent or High-Density Rockwool
Compliance General HVAC BOMBA 2026 Life Safety Standard

Why Choose EKG M&E Sdn Bhd?

More detail about EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD
Contact Us flagMalaysia