Surgery Room AC

Kategorya: Cleanroom & Hospital Grade AHU Specifications Magagamit
Para sa karagdagang impormasyon, bisitahin ang aming opisyal na website sa eakon.com.my

Deskripsyon

In the 2026 clinical landscape, Surgery Room AC (Operating Theater HVAC) is a critical life-safety system. It must maintain a sterile "protective zone" around the patient while adhering to the Energy Efficiency and Conservation Act (EECA) 2024 and MOH (Ministry of Health) Malaysia standards.

At EKG (Malaysia) SDN BHD, we engineer surgery room systems that prioritize Laminar Flow and precision pressure control to eliminate the risk of surgical site infections (SSIs).


1. The Sterile Air Pattern: Laminar Flow

For high-risk surgeries (Orthopedic, Cardiac, Neuro), a "Turbulent" air pattern is insufficient. We utilize Unidirectional (Laminar) Flow to wash the surgical site of contaminants.


2. Clinical Engineering Specifications

A surgery room AHU must be a "Biologically Inert" machine. At EKG, we build to HTM 03-01 and VDI 6022 hygiene standards:


3. Comparison: Standard AC vs. EKG Surgery Room System

Feature Standard Commercial AC EKG Surgery Room AC
Airflow Pattern Turbulent / Mixing Laminar (Unidirectional)
Filtration F7 / F9 H14 HEPA (Terminal)
Pressure Target Neutral Strict Positive (+15 Pa)
Air Change Rate 6 – 10 ACH 20 – 25+ ACH
Pathogen Control None Integrated UV-C (254nm)
Energy Strategy Basic EECA 2024 Star-Rated

4. 2026 Energy Compliance (EECA 2024)

Maintaining 25 air changes per hour through HEPA filters is energy-intensive. To ensure your facility passes its 2026 statutory energy audit, we utilize:


5. Maintenance & Validation for Audits

Starting in 2026, hospital performance data must be verifiable for the Energy Commission and MOH.

Why Partner with EKG (Malaysia) SDN BHD? We provide the full Validation Documentation (IQ/OQ) and Airflow Mapping required for clinical license renewals. Our systems are fire-rated (Class 0 / B1) and designed for a 25-year clinical lifecycle.

Is your operating theater's AC system prepared for the 2026 safety and energy audits? Contact us today for a technical modernization audit.

Tingnan ang karagdagang mga detalye tungkol sa EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD