Testing & Commissioning (T&C): IAQ & Filtration Efficiency Validation

In the 2026 Malaysian regulatory landscape, Indoor Air Quality (IAQ) and Filtration Efficiency Validation have shifted from optional "wellness" features to mandatory statutory requirements. Under DOSH (JKKP) 2026 and the Industry Code of Practice on Indoor Air Quality (ICOP IAQ), building owners in KL and Selangor are legally obligated to prove that their AHU systems can maintain a sterile environment and mitigate bio-contaminants.

At EKG (Malaysia) SDN BHD, our validation protocols ensure your facility satisfies DOSH health audits while maintaining the energy efficiency targets set by the EECA 2024.


1. The Statutory Framework: DOSH 2026 & MS 1525

Current enforcement requires empirical proof that the AHU is delivering "Clean Air" as defined by the latest Malaysian standards.


2. Filtration Efficiency Validation Protocol

We perform a three-stage audit to ensure your filtration system is a true barrier, not just a "dust catcher."

Step 1: Filter Pressure Drop ($\Delta P$) Audit

We measure the static pressure before and after the filter bank using digital manometers.

Step 2: In-Situ Particle Count Test

Utilizing NATA-traceable particle counters, we measure the concentration of PM2.5 and PM10 in the supply air stream vs. the return air. This verifies the actual Capture Efficiency of the installed MERV 13+ media.

Step 3: Filter Frame Integrity (The "Light Leak" Test)

A high-efficiency filter is useless if air leaks around the frame. We physically verify the gasket seals and frame rigidity to ensure 100% Seal Integrity, preventing "Unfiltered Bypass."


3. Engineering for "Biological Safety"

The success of IAQ validation depends on the mechanical health of the "wet" sections of the AHU.

  1. Condensate Pan & Trap Audit: We verify the 1:100 statutory slope and the priming of the P-trap. Stagnant water is a primary source of mold and Legionella. A dry trap allows "Sewer Gas" or contaminants to be sucked into the building.

  2. UV-C Intensity Verification: For units equipped with Germicidal UV-C lamps, we measure the $\mu W/cm^2$ output to ensure the dosage is sufficient to deactivate 99.9% of pathogens on the cooling coil surface.

  3. Fresh Air Intake Positioning: We verify that the AHU's fresh air intake is not located near cooling towers or exhaust vents, preventing "Cross-Contamination" as per DOSH 2026 guidelines.


4. The "Fire Mode" Statutory Protocol

IAQ and filtration components must maintain integrity during a fire event per BOMBA (JBPM) 2026.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU delivering sterile air or circulating bio-contaminants?

Contact EKG (Malaysia) SDN BHD today for a professional IAQ & Filtration Efficiency Validation.