T&C: New AC Commissioning (2026 Statutory Standards)

In the 2026 Malaysian engineering landscape, New AC Commissioning is the critical "Phase-Gate" required to legally transition a mechanical installation into an operational asset. Under the Energy Efficiency and Conservation Act (EECA) 2024, commissioning is no longer a simple startup; it is a statutory verification that the system—from the VFD-driven AHU to the Terminal Diffuser—meets mandatory performance and safety benchmarks.

At EKG (Malaysia) SDN BHD, we act as your technical auditors, ensuring your new system is Statutory-Compliant, Energy-Optimized, and BOMBA-Ready for Grade-A office and industrial environments.


1. The Statutory Framework: EECA 2024 & MS 1525

Commissioning provides the empirical evidence required by the Suruhanjaya Tenaga (ST) to certify your building's Energy Intensity (BEI).


2. Core Commissioning Modules

Our mechanical specialists follow a rigorous "Path of the Air" methodology to ensure no energy is wasted between the plant room and the occupant.

Commissioning Phase Engineering Metric Purpose
Volumetric Traverse $m^3/h$ (Duct Traverse) Confirms the unit delivers the exact design volume for thermal comfort.
ESP Verification Static Pressure (Pa) Measures system resistance to ensure the fan isn't "choking" (wasting power).
Duct Integrity Audit SMACNA Seal Class A Verifies that the "Duct Highway" is zero-leakage, preventing unconditioned air loss.
Hydronic Verification Delta T & Flow Rate Ensures a high temperature difference ($5.5^\circ\text+$ ) for chiller efficiency.

3. Engineering for "Acoustic and Thermal Excellence"

The commissioning phase is where the system is "tuned" to satisfy DOSH (JKKP) 2026 Indoor Environmental Quality standards.

  1. Acoustic Signature: We perform Sound Power Level Verification to ensure the unit operates within the NC 30-35 target for office productivity.

  2. Psychrometric Mapping: We verify the Air-Side Heat Transfer to ensure the cooling coil effectively removes Malaysia's 90% humidity, preventing mold and "sticky" air.

  3. Hygienic Validation: We verify the 1:100 statutory slope of the drain pan and the priming of the P-trap. A dry trap is a primary source of bio-contaminant suction.


4. The "Fire Mode" Statutory Witness Test

The most critical safety phase for your annual Fire Certificate (FC) renewal is the BOMBA (JBPM) 2026 integration test.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your new AC system documented and ready for its 2026 statutory audit?

Contact EKG (Malaysia) SDN BHD today for professional New AC Commissioning & Compliance Audit services.