In the 2026 Malaysian engineering landscape, New AHU Verification is the comprehensive Testing & Commissioning (T&C) process required to legally transition a mechanical installation into an operational asset. Under the Energy Efficiency and Conservation Act (EECA) 2024 and MS 1525:2024, verification is the "Proof of Performance" required by the Suruhanjaya Tenaga (ST), DOSH (JKKP), and BOMBA (JBPM).
At EKG (Malaysia) SDN BHD, our verification protocols are Statutory-Compliant and Data-Driven, ensuring your system is Sterile, Silent, and Energy-Optimized for Grade-A office and industrial environments.
Verification serves as the empirical evidence for a building's Energy Management System (EnMS) and annual safety audits.
EECA 2024 (Energy): Verification proves the Specific Fan Power (SFP) is within the 1.6 kW/m³/s limit. This requires simultaneous measurement of airflow and motor power.
DOSH 2026 (Health): Validates the Indoor Air Quality (IAQ) capabilities, including 100% filter seal integrity and CO2 management.
GITA Prerequisite: A successful verification report is a technical requirement for claiming the 100% Green Investment Tax Allowance (GITA) for high-efficiency cooling systems.
Our mechanical specialists perform a multi-layered audit to validate the entire air-handling cycle.
| Verification Phase | Technical Target | Engineering Action |
| Volumetric Verification | Design $m^3/h$ (±10%) | AHU Airflow Test using the duct traverse method. |
| Pressure Integrity | System ESP Optimization | ESP Verification to ensure the fan isn't fighting high resistance. |
| Thermal Verification | Enthalpy / Heat Transfer | Air-Side Heat Transfer Validation via psychrometric mapping. |
| Acoustic Verification | NC 30 - 35 Target | Sound Power Level Verification to ensure a silent office. |
The accuracy of the verification depends on the quality of the AHU Ducting Service.
DALT (Duct Air Leakage Test): We verify that the system meets SMACNA Seal Class A. Any air lost through leaks is "Spent Energy" that inflates the building's Energy Intensity (BEI).
VFD Logic Verification: We validate the VFD Integrated Static Pressure Transducer calibration. The system must prove it can accurately "ramp down" during partial load to save energy.
Hygienic Validation: We verify the 1:100 statutory slope of the drain pan and the priming of the P-trap to ensure no bio-contaminants enter the air stream.
The verification process includes a mandatory life-safety integration test for BOMBA (JBPM) 2026 compliance.
FAMS Signal Response: We trigger the Fire Alarm Monitoring System to witness the Automatic Fire Signal AHU Shut-off.
Damper Physical Audit: We physically verify that all Motorized Fire Dampers (MFDs) in the validated air path reach a 100% closed, smoke-tight position.
BOMBA Documentation: This data is recorded in the Safety Check Logbook required for your annual Fire Certificate (FC).
Technical Integrity: We are installation and T&C specialists, not fabricators. Our verification is an objective assessment of your system’s real-world health.
Audit-Ready Reporting: We provide a comprehensive New AHU Verification Report including psychrometric charts, SFP calculations, and acoustic signatures.
REM Support: Our documentation is formatted specifically to assist your Registered Energy Manager (REM) with mandatory statutory energy submissions.
Is your AHU system verified to 2026 statutory energy and safety standards?
Contact EKG (Malaysia) SDN BHD today for a professional New AHU Verification & Compliance Audit.