Centralized AC commissioning

Centralized AC commissioning

分类: Air Balancing and Comissioning 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

Centralized AC Commissioning by EKG M&E Sdn Bhd

In 2026, Centralized AC Commissioning is the critical bridge between mechanical installation and operational excellence. Under the Energy Efficiency and Conservation Act (EECA) 2024, which reached full enforcement in 2025, a centralized system—whether it’s a Chilled Water (CHW) plant or a large-scale VRF system—is not legally considered "operational" until it has passed a certified commissioning audit.

At EKG M&E Sdn Bhd, we apply 34 years of mechanical engineering expertise to ensure your centralized plant in Kuala Lumpur or Selangor delivers the exact cooling capacity required while maintaining a 5-Star Energy Intensity Label.


1. The Engineering Logic of Centralized Commissioning

Commissioning is a systematic process of verification that ensures all subsystems—chillers, pumps, cooling towers, and Air Handling Units (AHUs)—act as a single, efficient organism.


2. The 2026 Commissioning Protocol (TAB-Integrated)

Our 2026 protocol follows the MS 1525:2024 and ASHRAE 111 standards, providing an audit-ready "Digital Path" for your facility:

Phase A: Pre-Functional Verification

We verify the physical integrity of the plant before startup. This includes a mandatory Duct Leakage Test (DW143) and a pipework hydrostatic test to ensure the "Injection Path" for your cooling is hermetic.

Phase B: Hydronic & Air Balancing (TAB)

We balance the water flow to every AHU and the airflow to every zone. Using calibrated ultrasonic flow meters and digital air hoods, we ensure that no area is "starved" of cooling while others are over-cooled.

Phase C: Functional Performance Testing (FPT)

We simulate extreme load conditions. We observe the plant's response to a "Full Load" (mid-day sun) and "Minimum Load" (night-time) to verify that the bypass valves and VFDs respond without "hunting" or energy spikes.


3. Compliance & BEI Audit Documentation

At EKG M&E Sdn Bhd, our commissioning reports satisfy the requirements of Suruhanjaya Tenaga (ST) and DOSH:

Commissioning Component Benefit for the Building Owner
Certified TAB Report Proof of compliance with the 10 l/s per person fresh air mandate.
Chiller Plant Efficiency (IKW/TR) The definitive data needed for your BEI Star Rating.
Pump & Fan Power Logs Verification that your system meets MS 1525 energy limits.
BMS Sequence Validation Ensures your automation isn't wasting money through "Ghost Cooling."
DOSH IAQ Proof Proof that the system maintains the legal 500 cfu/m3 bacterial ceiling.

4. Why Commissioning is Essential for Your Asset

Why Choose EKG M&E Sdn Bhd?

Is your centralized AC system a high-performance asset or an unverified liability? Contact EKG M&E Sdn Bhd today for professional centralized AC commissioning and secure the 5-star efficiency of your building.