In 2026, Ventilation Testing is no longer just a comfort check—it is a critical biosecurity and energy mandate. Under the Energy Efficiency and Conservation Act (EECA) 2024 and the DOSH ICOP IAQ 2026 (Industry Code of Practice on Indoor Air Quality), every commercial and industrial facility in Kuala Lumpur and Selangor must prove that its "Air Path" is both efficient and safe.
At EKG M&E Sdn Bhd, we apply 34 years of mechanical engineering expertise to provide comprehensive ventilation testing, ensuring your building stays below the legal bacterial ceilings while maintaining a 5-Star Energy Intensity Label.
Ventilation is the mechanical process of replacing "stale" indoor air with "fresh" outdoor air. Testing identifies if your system is actually delivering the intended health and efficiency outcomes.
The 10 l/s Mandate: We verify that your system delivers the legally required 10 liters per second (l/s) per person of fresh air. This is the primary defense against "Sick Building Syndrome."
Pressure Cascade Control: We test the pressure relationship between different zones (e.g., toilets vs. offices, or kitchens vs. dining areas). Proper testing ensures odors and contaminants are "pulled" into exhaust streams rather than "pushed" into occupant zones.
Energy Penalty Identification: Testing identifies "Over-Ventilation," where excessive hot, humid Malaysian air is brought in, forcing chillers to work 20% to 30% harder than necessary to dehumidify the space.
We utilize laboratory-grade diagnostic instruments to provide the "Digital Audit Trail" required for your Registered Energy Manager (REM) and Suruhanjaya Tenaga (ST) audits:
Using calibrated Digital Air Hoods (Balometers) and Pitot tube traverses, we measure the actual cubic meters per hour (CMH) at both the supply and exhaust points. This quantifies the Air Change Rate (ACR) for each room.
We use $CO_$ sensors to track how well fresh air is mixing within the space. High $CO_$ pockets (above 1,000 ppm) indicate "Dead Zones" where ventilation is failing, regardless of what the fan speed says.
We perform pressurized smoke testing or PANDA testing to identify leaks in your ductwork. If your "Fresh Air Path" is leaking into the ceiling void, you are paying to cool a space where no one sits.
In accordance with DOSH 2026 standards, we sample the air for fungal and bacterial counts. We verify that your ventilation system is keeping microbial levels below the 500 cfu/m3 legal ceiling.
| Metric | Regulatory Standard | EKG Certified Performance |
| Fresh Air Volume | 10 l/s per person | Verified & Logged |
| CO2 Levels | < 1,000 ppm | Mapped & Optimized |
| Bacterial Ceiling | 500 cfu/m3 | Lab-Certified Proof |
| Specific Fan Power | MS 1525:2024 Compliant | Calculated & Optimized |
| Building Pressure | +5 to +12 Pa (Positive) | Stabilized & Calibrated |
Lowering TNB Maximum Demand: By identifying and eliminating over-ventilation, we reduce the load on your chillers, directly lowering your monthly peak power charges.
Securing Your 5-Star BEI: Precise ventilation testing is the only way to satisfy the Building Energy Index (BEI) requirements of the EECA 2024.
Preventing "Ceiling Sweating": In KL’s 80%+ humidity, unverified ventilation leads to localized "Cold Plumes" and moisture buildup. Our testing prevents mold growth and structural ceiling damage.
34 Years of Engineering Depth: Based in KL, we understand the specific aerodynamic challenges of tropical high-rises. We use math and metrology, not guesswork.
Turnkey Documentation: You receive a comprehensive, digital "Ventilation Audit Report" recognized by ST, DOSH, and BOMBA.
BIM & Digital Twin Integration: We can update your 3D facility models with the final "As-Tested" ventilation data, allowing for real-time performance tracking.
Is your facility's ventilation path legally compliant and energy-efficient? Contact EKG M&E Sdn Bhd today for professional ventilation testing services and secure the 5-star performance of your building.
更多 EKG M & E SDN BHD 相关资料
Malaysia