What Certifications and Registrations Should a Malaysian Solar Installer Have?
A Malaysian solar company should not be assessed using one certificate alone. The registrations required depend on whether the company is selling the system, preparing a Solar ATAP application, carrying out electrical work, providing engineering services, performing construction work or issuing technical endorsements. Property owners should verify both the contracting company and every separate technical party named in the proposal.
What Are the Main Registrations to Check?
A complete solar project may involve several companies and professionals. One company may sell the system, another may submit the application, another may carry out the electrical work and another may provide engineering certification.
SSM Registration
Confirms the legal Malaysian business or company that is offering, contracting or invoicing for the project.
SEDA Malaysia RPVSP
Identifies a Registered PV Service Provider listed for relevant solar PV service and application activities.
Electrical Contractor
Confirms that the electrical contractor is registered for the applicable class and scope of electrical work.
Competent Person
Identifies the individual authorised for the applicable electrical installation, supervision, testing or certification responsibilities.
Qualified Person
Confirms the individual involved in the solar PV design has the relevant SEDA Malaysia-recognised qualification.
Professional and Construction Registration
BEM and CIDB registrations may be relevant where professional engineering or construction work forms part of the project.
- Current SSM company or business registration
- Correct legal company name
- Correct company-registration number
- Current SEDA Malaysia RPVSP listing where applicable
- Current Energy Commission electrical-contractor registration
- Correct electrical-contractor class
- Relevant Energy Commission Competent Person
- Current competency certificate
- Relevant SEDA Malaysia Qualified Person
- Current GCPV-related qualification where applicable
- BEM registration where professional engineering is required
- Practising authority where professional services require it
- CIDB contractor registration where construction work applies
- Appropriate CIDB grade, category and specialisation
- Registered construction personnel where applicable
- Valid insurance coverage
- Documented warranty providers
- Traceable equipment certification
- Written after-sales support process
- Clear division of responsibility between parties
Why Should the Solar Company Have a Valid SSM Registration?
The Companies Commission of Malaysia registration identifies the legal entity entering into the contract. Property owners should confirm that the company name on the quotation, agreement, invoice, bank account, warranty and official registrations is consistent.
| SSM Check | What to Confirm | Possible Warning Sign |
|---|---|---|
| Legal Name | The company name matches the quotation and contract. | The salesperson uses a brand with no clear legal entity. |
| Registration Number | The number is valid and consistently shown. | Different numbers appear on the invoice and agreement. |
| Business Status | The company or business remains active. | The registration is expired, terminated or unrelated. |
| Registered Address | A traceable business address is available. | Only a personal messaging account is provided. |
| Directors or Owners | The people representing the company are authorised. | Payment is requested to an unrelated personal account. |
| Business Activity | The company’s activities are reasonably connected to its role. | The entity cannot explain its contractual or technical role. |
Should the Installer Be a SEDA Malaysia Registered PV Service Provider?
For Solar ATAP and other relevant solar PV processes, property owners should confirm whether the project and application are being managed by a company listed in SEDA Malaysia’s Registered PV Service Provider directory. The directory listing should be checked using the exact legal company name.
- Company appears in the current RPVSP directory
- Legal name matches the quotation
- Registration details match the contracting party
- Listed contact information is current
- RPVSP role is stated in the proposal
- eATAP submission responsibility is stated
- Technical-document responsibility is stated
- Application-update responsibility is stated
- Approval-condition responsibility is stated
- Post-approval support is stated
- Any subcontracted RPVSP is identified
- Applicant receives a copy of the final submission
What Electrical-Contractor Registration Should Be Checked?
Solar PV systems form part of an electrical installation. The electrical work should therefore be undertaken through an appropriately registered Electrical Contractor or Electrical Services Contractor for the applicable installation and scope.
| Electrical Check | What to Confirm | Why It Matters |
|---|---|---|
| Registered Contractor | The contractor is registered with the Energy Commission. | Electrical work must be carried out through an authorised party. |
| Registration Class | The class is suitable for the project’s voltage and work scope. | Not every registration class covers every installation. |
| Registration Validity | The certificate remains valid during the project. | An expired registration may affect legal and technical responsibility. |
| Named Company | The registered contractor is clearly identified in the contract. | The salesperson may not be the actual electrical contractor. |
| Competent Person | The contractor has the relevant Competent Person for the work. | Company registration alone does not replace individual competency. |
| Testing and Certification | The party responsible for testing and completion certification is stated. | Installation may be completed without clear certification responsibility. |
What Is an Energy Commission Competent Person?
An electrical Competent Person is an individual certified by the Energy Commission for a defined category of electrical responsibility. The appropriate competency depends on the voltage, installation and work being undertaken.
Supervision
The Competent Person may supervise electrical work within the scope of the person’s registered competency.
Testing
Applicable testing and commissioning responsibilities should be performed by the authorised technical parties.
Certification
Completion documents or declarations may require the appropriate Competent Person’s confirmation.
Defined Scope
A competency certificate applies only to the categories and limits stated by the issuing authority.
- Competent Person’s full legal name
- Competency-certificate number
- Competency category
- Applicable voltage level
- Scope of authorised work
- Certificate validity date
- Employer or contractor relationship
- Role in system design
- Role in installation supervision
- Role in testing
- Role in commissioning
- Role in completion certification
- Signature on relevant documents
- Consistency with eATAP records
What SEDA Malaysia Qualified Person Should Be Involved?
Solar PV design documents may require involvement or endorsement by a SEDA Malaysia-recognised Qualified Person with the relevant grid-connected photovoltaic design qualification. Property owners should ask who is responsible for the final system design rather than relying only on a salesperson’s preliminary layout.
- Qualified Person’s full name
- Qualification or certificate number
- Relevant GCPV design qualification
- Certificate validity where applicable
- Company relationship
- Role in the project
- Role in system sizing
- Role in single-line diagram preparation
- Role in equipment selection
- Role in technical calculations
- Role in application documents
- Required endorsement is present
When Should a BEM-Registered Engineer Be Involved?
Projects requiring professional engineering services, formal engineering certification, structural assessment or professional submission may need an appropriately registered engineer under the Board of Engineers Malaysia framework. The exact requirement depends on the service, building, authority and project complexity.
| Engineering Role | Possible Registration | Typical Project Relevance |
|---|---|---|
| Electrical Engineering Design | Relevant BEM-registered engineer | Complex electrical design, studies or professional engineering services. |
| Professional Submission | Professional Engineer with the applicable practising authority | Where a formal professional submission, certification or practice is required. |
| Structural Assessment | Relevant civil or structural professional | Roof loading, mounting supports, reinforcement or structural certification. |
| High-Voltage Project | Relevant electrical professional and competent parties | Complex high-voltage design and power-system requirements. |
| Independent Review | Appropriately qualified and registered professional | Independent checking of design, risk or structural adequacy. |
Does a Solar Installer Need CIDB Registration?
CIDB registration may be relevant where the contractor undertakes construction work within the scope of Malaysia’s construction-industry requirements. The required grade, category and specialisation should match the contract value and work being undertaken.
Contractor Registration
Confirms that the contractor is registered to undertake applicable construction work in Malaysia.
Grade
The contractor’s grade should be suitable for the applicable project value and registration rules.
Category and Specialisation
The registered category and specialisation should reasonably cover the construction work included in the solar project.
Construction Personnel
Personnel entering and working on applicable construction sites may need current CIDB personnel registration and safety compliance.
- CIDB contractor-registration number
- Registration validity
- Contractor grade
- Registered category
- Registered specialisation
- Project-value suitability
- Company name matches the contract
- Construction personnel registration
- Site-safety requirements
- Subcontractor registration
- Project declaration where required
- Construction insurance where required
What Equipment Certifications and Warranty Evidence Should Be Checked?
Installer registrations do not automatically prove that every solar panel, inverter, protection device, cable or mounting component is suitable. Equipment compliance, product traceability and warranty support should be reviewed separately.
- Panel manufacturer and exact model
- Inverter manufacturer and exact model
- Equipment datasheets
- Applicable product standards
- Applicable testing certificates
- Local approval or listing where required
- Serial-number traceability
- Authorised distribution channel
- Manufacturer product warranty
- Manufacturer performance warranty
- Inverter warranty
- Mounting-system warranty
- Protection-equipment warranty
- Workmanship warranty
- Waterproofing warranty
- Warranty exclusions
- Claim submission process
- Malaysian warranty contact
- Replacement-labour responsibility
- Removal and reinstallation responsibility
| Evidence | What It Shows | What It Does Not Automatically Prove |
|---|---|---|
| Product Datasheet | Published model specifications and ratings. | That the supplied product is genuine or correctly installed. |
| Test Certificate | Testing against a stated standard or requirement. | That every warranty claim will be accepted. |
| Manufacturer Warranty | The manufacturer’s written warranty terms. | That labour, transport or reinstallation costs are included. |
| Installer Warranty | Coverage offered by the contracting or installation company. | That the company will remain operational throughout the warranty period. |
| Authorised-Distributor Evidence | A recognised product-supply channel. | That the entire system design is suitable for the property. |
What Insurance Should a Solar Installer Have?
Insurance requirements vary by company, site, contract and work scope. Property owners should ask for written evidence of the policies relevant to installation work, employees, third-party injury, property damage and professional responsibility.
- Public-liability insurance
- Employer or worker coverage
- Construction or installation coverage where applicable
- Property-damage coverage
- Professional-indemnity coverage where relevant
- Policy holder matches the responsible company
- Policy remains valid during installation
- Coverage limit is stated
- Exclusions are reviewed
- Subcontractor coverage is confirmed
- Incident-reporting procedure is stated
- Damage-claim contact is provided
How Should a Property Owner Verify a Solar Installer?
Identify Every Legal Entity
List the seller, contracting company, RPVSP, electrical contractor, system owner, financier and warranty provider.
Check SSM Information
Confirm the company name, registration number, status, address and authorised representatives.
Check the SEDA Directory
Verify the Registered PV Service Provider using its exact legal name.
Check Electrical Registration
Ask for the electrical-contractor certificate, class, validity and named Competent Person.
Check Individual Credentials
Verify the Competent Person, Qualified Person and professional engineers assigned to the project.
Check CIDB Where Applicable
Confirm the contractor grade, category, specialisation, personnel and subcontractors for construction work.
Check Insurance and Warranties
Review current policy evidence, warranty providers, exclusions and claim procedures.
Put Responsibilities in Writing
Ensure the agreement identifies who designs, submits, installs, tests, commissions, repairs and handles warranty claims.
| Claim Made by Installer | Evidence to Request | Additional Check |
|---|---|---|
| “We are SEDA registered.” | Exact RPVSP legal name and directory record. | Confirm the listing remains current. |
| “We are licensed electricians.” | Electrical-contractor certificate and Competent Person details. | Confirm class, validity and project scope. |
| “Our engineer will approve it.” | Engineer’s full name, BEM registration and project role. | Confirm the registration category is appropriate. |
| “We are CIDB registered.” | CIDB registration number, grade, category and specialisation. | Confirm suitability for the contracted work. |
| “The equipment is certified.” | Model-specific datasheets and test or approval records. | Confirm the delivered models match the proposal. |
| “Everything has a long warranty.” | Written warranty documents and claim contacts. | Check labour, transport, exclusions and company responsibility. |
What Installer Registration Red Flags Should You Watch For?
- Company name differs across documents
- No SSM registration number is provided
- Payment is requested to an unrelated personal account
- RPVSP registration belongs to another unidentified company
- Electrical contractor is not named
- Competent Person is not identified
- Qualified Person is not identified
- Certificates are expired
- Certificate numbers cannot be verified
- Registration class does not match the project
- Engineer’s role is described vaguely
- No structural professional is identified where needed
- CIDB status is claimed without registration details
- Subcontractors are not disclosed
- No insurance evidence is provided
- Warranty provider is not identified
- Equipment models are omitted
- Only generic certification logos are shown
- Application responsibility is unclear
- After-sales escalation is not documented
What Registration Questions Should You Ask Before Signing?
- What is the full legal name of the contracting company?
- What is the company’s SSM registration number?
- Does the company name match the bank account receiving payment?
- Which company is the SEDA Malaysia Registered PV Service Provider?
- Can I verify the RPVSP listing using the exact legal name?
- Which company will submit the eATAP application?
- Which company is the registered electrical contractor?
- What is the electrical-contractor registration number?
- What class of electrical-contractor registration applies?
- Is the registration valid throughout the project?
- Who is the appointed Competent Person?
- What is the Competent Person’s certificate category?
- Who is the appointed SEDA Malaysia Qualified Person?
- Who prepares and endorses the single-line diagram?
- Is a BEM-registered engineer involved?
- Does the project require a Professional Engineer with practising authority?
- Who assesses the roof structure?
- Does the contractor have valid CIDB registration?
- Does the CIDB grade cover the project value?
- Do the category and specialisation cover the work?
- Are construction personnel properly registered?
- Which activities will be subcontracted?
- Are all subcontractors identified?
- What insurance policies cover the installation?
- Which company provides the workmanship warranty?
- Which company provides the waterproofing warranty?
- Who handles manufacturer warranty claims?
- Are the quoted equipment models traceable?
- Will I receive copies of all certificates and approvals?
- Who remains responsible after installation is completed?
What Is Solar100’s Role in Installer Verification?
Solar100
- Supports solar-provider discovery
- Helps organise initial company information
- Supports quotation and scope comparison
- Highlights registration questions for consumers
- Does not issue government or professional registrations
- Does not guarantee installer performance or approval
Selected Provider and Appointed Professionals
- Maintain the registrations required for their work
- Provide current certificates and directory details
- Prepare and endorse technical documents
- Carry out authorised installation activities
- Complete testing, commissioning and certification
- Remain responsible for their agreed contractual scope
Frequently Asked Questions
What registrations should a Malaysian solar installer have?
Common checks include valid SSM registration, SEDA Malaysia RPVSP status where applicable, Energy Commission electrical-contractor registration, relevant Competent Person and Qualified Person credentials, and BEM or CIDB registration where the project scope requires them.
Is SSM registration enough to install solar panels?
No. SSM registration confirms the legal business entity but does not replace electrical-contractor registration, individual competency, solar-design qualification or other technical registrations.
What is a SEDA Malaysia Registered PV Service Provider?
A Registered PV Service Provider is a company listed through SEDA Malaysia’s relevant registration process for solar PV services. The exact legal company name should be checked in the current directory.
Must electrical work be carried out by a registered contractor?
Electrical work should be undertaken through an appropriately registered Electrical Contractor or Electrical Services Contractor, with the relevant Competent Person involved for the applicable work.
What is an electrical Competent Person?
A Competent Person is an individual certified by the Energy Commission for a defined category of electrical work, supervision, operation, testing or responsibility.
What is a SEDA Malaysia Qualified Person?
A Qualified Person is an individual with a relevant SEDA Malaysia- recognised solar PV design qualification who may be involved in preparing or endorsing applicable system-design documents.
Does every solar project require a Professional Engineer?
Not every project requires the same professional scope. A BEM-registered engineer may be required where professional engineering, structural certification, complex design or formal submission is needed.
Does a solar contractor need CIDB registration?
CIDB registration may be required where the contractor undertakes construction work. The applicable grade, category and specialisation should match the project and work scope.
Does RPVSP registration guarantee good workmanship?
No. Registration should be one part of the review. Consumers should also assess design quality, technical personnel, installation scope, insurance, warranties, references and after-sales support.
Does Solar100 certify or license solar installers?
No. Solar100 supports provider discovery and quotation comparison. Government bodies, professional boards and relevant authorities issue or administer the registrations applicable to each party.
Compare Registered Malaysian Solar Providers
Send your latest electricity bill, property location, property type, supply type, proposed capacity, roof information and preferred ownership model to compare providers, company registrations, application scope, electrical-contractor responsibilities, technical personnel, equipment, warranties and after-sales support.