How Do I Compare Solar Installers in Malaysia?

How Do I Compare Solar Installers in Malaysia?

Solar100 Malaysia Solar Installer Comparison Guide

How Do I Compare Solar Installers in Malaysia?

Last updated: July 2026

Comparing solar installers requires more than checking which company offers the lowest total price. A proper comparison should cover the legal contracting entity, SEDA registration, electrical credentials, system design, equipment specifications, generation assumptions, workmanship, warranty responsibilities, payment terms and long-term after-sales support.

Quick Answer Start by comparing at least three written quotations using the same proposed system capacity and project scope. Verify the installer’s current SEDA Registered PV Service Provider status, SSM company details, appointed electrical contractor and qualified technical personnel. Then compare the exact panel and inverter models, expected generation, self-consumption, export assumptions, mounting system, workmanship warranty, labour coverage, exclusions, application fees, payment milestones and post-installation support. Do not select an installer based only on price per kW.
SEDA Certified
SSM Registered
Gov Policy Compliant
O&M Support
Free Quote & Consult

What Should You Check First When Comparing Solar Installers?

1 Legal and Registration Checks
2 Technical Design and Equipment
3 Contract, Warranty and Scope
4 Service Record and Support

The first comparison should establish whether each quotation comes from a clearly identified company that is qualified and willing to take responsibility for the application, design, installation, commissioning and warranty support.

  • Exact legal company name
  • SSM registration number
  • Current company status
  • Current SEDA RPVSP listing
  • RPVSP registration details
  • Appointed electrical contractor
  • Energy Commission registration details
  • Assigned competent person
  • Assigned professional engineer, where required
  • Years in the solar PV business
  • Completed project track record
  • Experience with similar system sizes
  • Office and service contact details
  • Named project coordinator
  • Written installation contract
  • Written warranty responsibilities
Confirm Who Will Actually Perform the Project: The salesperson, marketing company, financing agent, RPVSP, electrical contractor and installation crew may be different parties. Their roles should be disclosed in writing.

Which Registrations Should a Malaysian Solar Installer Have?

Registration should be treated as a basic eligibility and traceability check. It does not replace a full comparison of engineering quality, contractual responsibility and after-sales performance.

SEDA RPVSP Status

Check whether the company is currently listed as a Registered PV Service Provider for the relevant application period.

SSM Company Details

Match the company name, registration number, status, registered address and business information against the quotation and contract.

Electrical Contractor

Confirm which registered electrical contractor will carry out or take responsibility for the applicable electrical work.

Competent Technical Personnel

Identify the competent person, wireman, engineer or other qualified party assigned to the installation and commissioning.

Verification What to Match Why It Matters
SEDA RPVSP Directory Legal company name and current listing status Confirms the company identified under the relevant registered PV service-provider framework
SSM Company Information Company number, status, address, directors and nature of business Helps verify the legal entity receiving payment and signing the contract
Energy Commission Records Electrical contractor and competent-person registration details Helps verify the parties responsible for regulated electrical work
Quotation and Invoice Same legal company entity across all documents Reduces confusion over who is responsible for delivery and warranty
Registration Is Not a Quality Guarantee: A registered company may still differ from another registered company in design capability, workmanship, equipment, price, warranty service and financial stability.

How Should Solar Quotations Be Compared?

Quotations should be normalised before comparing prices. Two proposals cannot be compared fairly if they use different capacities, panel models, inverter sizes, installation scopes or warranty coverage.

1

Match the System Size

Compare proposals with the same or clearly comparable panel and inverter capacities.

2

Match the Equipment

Record the exact manufacturer, model number, quantity and warranty for every major component.

3

Match the Project Scope

Confirm whether design, applications, studies, installation, commissioning and monitoring are included.

4

List All Exclusions

Identify charges for roof work, meter work, scaffolding, studies, cabling upgrades or authority fees.

5

Compare Warranty Liability

Separate equipment warranty, performance warranty, workmanship warranty and labour coverage.

6

Review the Contract

Check payment milestones, completion conditions, delays, variations, cancellation and dispute procedures.

Use a Like-for-Like Comparison: The cheapest total price may represent a smaller system, lower inverter capacity, different equipment, fewer services or weaker warranty coverage.

How Do You Compare the Proposed Solar System Size?

A larger system is not automatically better. The recommended capacity should be supported by electricity bills, daytime usage, roof conditions, applicable programme limits and realistic energy-flow assumptions.

  • Total solar panel DC capacity
  • Total inverter AC capacity
  • DC-to-AC sizing ratio
  • Number of solar panels
  • Panel wattage
  • Number and model of inverters
  • Domestic supply phase
  • Maximum Demand, where applicable
  • Monthly electricity consumption
  • Daytime electricity usage
  • Weekend and holiday loads
  • Expected self-consumption percentage
  • Expected exported electricity
  • Usable roof area
  • Roof orientation and pitch
  • Shading assumptions
Installer A Installer B Installer C What to Evaluate
Smaller capacity Medium capacity Maximum permitted capacity Which option best matches daytime demand and expected energy use?
Higher self-consumption Balanced self-use and export Higher expected export How does export treatment affect savings and the payback period?
Lower project cost Moderate project cost Higher project cost Does the additional capacity provide proportionate financial value?
Ask Why Each Capacity Was Recommended: A proposal that merely uses the maximum available roof area or programme limit may not be financially optimised for the consumer’s actual load.

How Should Solar Panels, Inverters and Equipment Be Compared?

Equipment Item Details to Compare Important Questions
Solar Panels Manufacturer, exact model, rated output, efficiency, dimensions, product warranty and performance warranty Is the exact model stated in the contract, and who handles a panel claim?
Solar Inverter Manufacturer, model, AC rating, MPPT configuration, monitoring, product warranty and replacement procedure Is labour included if the inverter fails during the warranty?
Mounting System Rail material, clamps, roof attachments, fasteners, corrosion protection and waterproofing method How will the system be attached without damaging the roof?
Cables and Connectors Cable type, routing, containment, connector compatibility, labelling and weather protection Will compatible approved connectors and proper cable support be used?
Protection Equipment Isolators, breakers, surge protection, earthing and required electrical labels Are the ratings and protection arrangement shown in the design?
Monitoring System Portal access, mobile application, owner account, alerts, data retention and service access Will the system owner receive permanent administrator access?
Do Not Accept Brand Names Alone: The proposal should state exact model numbers because products from the same manufacturer may have different ratings, features and warranty terms.

How Should Generation and Savings Estimates Be Compared?

Generation and savings projections should show their underlying assumptions. An unusually high forecast may make a proposal appear more attractive without providing a realistic comparison.

Annual Solar Generation

Compare the projected annual kWh and the modelling assumptions used to calculate it.

System Losses

Check whether temperature, inverter, wiring, soiling, shading and degradation losses are included.

Self-Consumption

Compare how much solar energy is expected to be consumed directly at the property.

Exported Electricity

Check how exported electricity is valued and whether any excess could remain unused under the applicable programme rules.

  • Annual generation in kWh
  • First-year system yield
  • Solar irradiation assumption
  • Shading-loss assumption
  • Soiling-loss assumption
  • Temperature-loss assumption
  • Inverter and wiring losses
  • Annual degradation assumption
  • Self-consumption percentage
  • Export percentage
  • Electricity tariff assumption
  • Export-credit assumption
  • Tariff-inflation assumption
  • Maintenance-cost assumption
  • Equipment replacement assumption
  • Estimated payback period
Savings Are Estimates, Not Guaranteed Returns: Weather, consumption changes, downtime, tariff changes, export treatment, equipment performance and maintenance can affect actual results.

How Do You Compare Installation Quality and Workmanship?

Installation quality affects electrical safety, roof integrity, performance, maintenance access and long-term reliability. Request details about how the system will be installed, not only what equipment will be supplied.

Roof Attachment Check the fixing method, flashing, sealing, load distribution and procedure for different roof materials.
Cable Management Check cable support, routing, bend radius, roof contact, connector protection and labelling.
Electrical Protection Check isolators, breakers, surge protection, earthing, enclosure ratings and protection coordination.
Testing and Commissioning Check which tests will be performed, who will sign them and which records will be given to the owner.
  • Site-specific installation drawing
  • Roof attachment method
  • Waterproofing procedure
  • Structural review where required
  • Corrosion-resistant materials
  • Compatible mounting components
  • Safe roof-edge clearance
  • Maintenance access
  • Protected cable routing
  • Proper cable support
  • Electrical labels
  • Isolation equipment
  • Earthing arrangement
  • Surge protection
  • Testing records
  • Commissioning report
Request Photographs of Comparable Completed Projects: Look closely at cable routing, inverter placement, roof attachments, labels, switchgear and general installation neatness.

How Should Solar Warranties Be Compared?

Separate the installer’s obligations from the manufacturer’s obligations. A long equipment warranty does not automatically include inspection, labour, transport, removal or reinstallation.

Warranty Type Usually Provided By What to Compare
Panel Product Warranty Panel manufacturer Period, covered defects, claim process, replacement basis and labour exclusions
Panel Performance Warranty Panel manufacturer Degradation curve, minimum warranted output, testing requirements and remedy
Inverter Product Warranty Inverter manufacturer Warranty period, extension options, replacement time and labour coverage
Workmanship Warranty Solar installer Duration, covered installation defects, roof-leak treatment, response time and exclusions
O&M or Service Support Installer or service provider Monitoring, inspection, cleaning, response, reporting and renewal fees
Ask Who Pays for Warranty Labour: A defective component may be replaced by the manufacturer while the owner remains responsible for diagnosis, transport, scaffolding, removal and installation.

How Do You Compare After-Sales and O&M Support?

  • Dedicated service contact
  • Monitoring-alert response
  • Remote troubleshooting
  • Site-visit response target
  • Service coverage area
  • Business-hours support
  • Emergency contact procedure
  • Preventive inspection options
  • Panel-cleaning options
  • Annual performance report
  • Warranty-claim coordination
  • Replacement-equipment process
  • Labour charges after installation
  • Travel and transport charges
  • Monitoring subscription fees
  • O&M renewal fees

Monitoring Ownership

Confirm that the property owner receives direct access to the monitoring platform and system data.

Fault Response

Ask how the provider prioritises inverter failure, zero generation, communication faults and safety concerns.

Warranty Coordination

Confirm whether the provider submits manufacturer claims and who pays for related labour and logistics.

Long-Term Service

Check the service arrangement after the initial workmanship or free maintenance period ends.

Ask for Service Commitments in Writing: General promises such as “full support” or “lifetime service” should be replaced with clear coverage, response, fee and exclusion terms.

How Should Solar Prices and Payment Terms Be Compared?

Compare both the total project cost and the completeness of the included scope. Price per kW can be useful only when the capacities, equipment and services are genuinely comparable.

Cost Item Confirm Whether Included
Solar panels and inverter Exact models, quantities and ratings
Mounting and electrical materials Complete supply and installation scope
System design and drawings Required design, single-line diagram and endorsements
Application and authority procedures Provider services versus separate official fees
Technical studies CCC, CAS, PSS or other project-specific requirements
Meter-related work Utility charges, wiring modification and meter-board work
Roof and structural work Assessment, reinforcement, repair or waterproofing exclusions
Monitoring and communications Data logger, meter, internet device and subscription fees
Testing and commissioning Technical testing, reports and handover records
Warranty and maintenance labour Included period and later service charges
  • Deposit amount
  • Application-stage payment
  • Equipment-order payment
  • Delivery-stage payment
  • Installation-stage payment
  • Commissioning-stage payment
  • Final retention amount
  • Refund conditions
  • Cancellation charges
  • Variation-order procedure
  • Delay responsibilities
  • Financing charges
  • Insurance requirements
  • Tax treatment
  • Official fees
  • Quotation-validity period
A Large Upfront Payment Increases Consumer Exposure: Payment milestones should correspond to identifiable deliverables such as approval, equipment delivery, completed installation, commissioning and handover.

What Are Common Solar Installer Red Flags?

  • Refuses to provide the legal company name
  • Requests payment to an unrelated entity
  • Cannot confirm current SEDA listing status
  • Does not identify the electrical contractor
  • Does not identify qualified technical personnel
  • Provides only verbal warranty promises
  • Does not state exact equipment models
  • Guarantees a fixed savings amount
  • Guarantees an exact payback period
  • Promises approval before technical review
  • Uses unusually high generation assumptions
  • Ignores shading or roof limitations
  • Does not inspect the electrical installation
  • Hides application or study fees
  • Requires nearly full payment before completion
  • Does not provide a written contract
  • Cannot explain warranty-claim labour
  • Does not provide system handover documents
Pressure to Sign Immediately Is Not Technical Evidence: Limited-time discounts should not prevent the customer from verifying the company, reviewing the contract or comparing quotations.

Solar Installer Comparison Scorecard

Comparison Category Suggested Weight What a Strong Proposal Shows
Registration and Accountability 15% Verified legal entity, current registrations and clearly assigned responsible parties
Technical Design 20% Site-specific capacity, layout, electrical design and transparent sizing assumptions
Equipment and Materials 15% Exact model numbers, complete specifications and suitable component selection
Workmanship and Safety 15% Clear roof, mounting, wiring, protection, testing and commissioning methods
Warranty and Support 15% Written workmanship, product, labour and after-sales responsibilities
Price and Contract Terms 15% Complete scope, reasonable milestones and clearly listed exclusions
Track Record and References 5% Relevant completed projects and verifiable customer references
Adjust the Weighting to the Project: A commercial or industrial installation may place more weight on engineering capability, financial strength, project management, safety and long-term O&M support.

What Is the Difference between Solar100 and the Solar Installer?

Solar100 Solar Installer or Service Provider
Provides general comparison guidance Assesses the property and electricity account
Helps users discover participating providers Designs and prices the project-specific system
Highlights verification and quotation questions Prepares technical documents and applications
Does not approve the installer’s design Takes responsibility for its proposed design and scope
Does not perform electrical or roof work Performs or coordinates installation work
Does not test or commission the system Performs or coordinates testing and commissioning
Does not issue manufacturer warranties Coordinates applicable product and workmanship claims
Does not guarantee approval or savings Provides project estimates and contractual commitments
Solar100 Is a Discovery and Comparison Platform: Each installer remains responsible for its own registration status, quotation, design, application, installation, warranty and contractual performance.

What Should You Ask Every Solar Installer?

  1. What is your exact legal company name and SSM number?
  2. Are you currently listed as a SEDA Registered PV Service Provider?
  3. Which company will sign the installation contract?
  4. Which company will receive my payment?
  5. Which registered electrical contractor will perform the work?
  6. Who is the assigned competent person or engineer?
  7. How many similar projects have you completed?
  8. Why did you recommend this system capacity?
  9. What are the exact solar panel and inverter models?
  10. What annual generation do you estimate?
  11. Which losses are included in the forecast?
  12. What self-consumption and export rates are assumed?
  13. How will the mounting system be attached to my roof?
  14. Who is responsible if the roof leaks?
  15. What does the workmanship warranty cover?
  16. Who pays the labour for equipment warranty claims?
  17. Which application, study and meter fees are excluded?
  18. What documents will I receive at handover?
  19. What after-sales response is included?
  20. What happens if the project is delayed or cancelled?
Request Written Answers: Important promises about equipment, generation, approval, waterproofing, warranties, response times and fees should appear in the quotation or contract.

What Should You Prepare before Requesting Solar Quotations?

  • Recent TNB electricity bills
  • TNB account number
  • Domestic or non-domestic tariff
  • Single-phase or three-phase supply
  • Maximum Demand records, where applicable
  • Monthly electricity consumption
  • Daytime operating hours
  • Weekend operating pattern
  • Planned future electrical loads
  • Roof photographs
  • Roof dimensions
  • Roof material
  • Known roof defects
  • Known shading conditions
  • Main switchboard photographs
  • Existing meter photographs
  • Preferred purchase or financing method
  • Expected project timeline

Frequently Asked Questions

How many solar quotations should I compare?

Comparing at least three written quotations can help reveal differences in system sizing, equipment, assumptions, scope, warranties and price.

Should I choose the cheapest solar installer?

Not automatically. A lower price may exclude technical studies, roof work, meter work, monitoring, warranty labour or long-term support.

How can I verify a solar installer in Malaysia?

Check the company’s current SEDA RPVSP status, SSM information, electrical-contractor details and assigned qualified technical personnel.

Are all solar quotations directly comparable?

No. First confirm that the proposed capacities, equipment models, project scope, warranties and exclusions are comparable.

Does SEDA registration guarantee good workmanship?

No. Registration is an important verification point, but workmanship, engineering, service quality and contract terms must still be assessed.

What is the most important solar warranty question?

Ask who pays for inspection, labour, transport, removal and reinstallation when a panel, inverter or other component fails.

The information on this page is provided for general educational and comparison purposes. It is not an endorsement of any installer, engineering design, legal interpretation, financial recommendation, warranty approval, safety certification, application approval or guarantee of generation, savings, workmanship or service performance. Registration status, competent personnel, contractor details, company information, equipment availability, programme requirements and warranty terms may change. Solar100 is a solar discovery and comparison platform. It is not SEDA Malaysia, the Energy Commission, SSM, TNB, an electricity utility, Registered PV Service Provider, electrical contractor, engineering consultant, equipment manufacturer, insurer, lender, regulator or government authority. Consumers should verify current official records, obtain written quotations, review the complete contract and seek project-specific technical or legal advice where required before making payment.