What Questions Should I Ask Before Signing a Solar Contract?
Before signing a solar contract, confirm exactly which company is responsible for the project, what equipment and system capacity will be installed, which services are included, how payments are linked to deliverables, who handles applications and technical work, and what happens if the project is delayed, rejected, changed or affected by an equipment or workmanship failure.
What Should Be Confirmed before Signing a Solar Contract?
Verify the Company
Match the legal company name, registration details, quotation, invoice and payment account.
Verify the Technical Parties
Identify the RPVSP, electrical contractor, competent person and engineer where applicable.
Freeze the System Specification
Record the exact system capacity, equipment models, quantities and installation method.
Define the Complete Scope
Separate included services, official fees, optional services and project exclusions.
Link Payments to Deliverables
Each payment should correspond with a clear approval, delivery, installation or commissioning milestone.
Confirm Remedies
State what happens if approval fails, equipment changes, work is delayed or warranty support is required.
What Should I Ask about the Solar Company and Installer?
- What is the exact legal name of the company signing the contract?
- What is the company’s SSM registration number?
- Does the quotation use the same legal company name?
- Will the invoice be issued by the same company?
- Will payment be made to an account under the same company name?
- Is the company currently listed as a SEDA RPVSP?
- What is the company’s current RPVSP registration information?
- Which company will submit the Solar ATAP application?
- Which registered electrical contractor will perform the work?
- Who is the competent person assigned to the project?
- Is a professional engineer required for this installation?
- Will any part of the project be subcontracted?
- Who will supervise the installation crew?
- Who will remain responsible if a subcontractor causes damage?
- How many comparable projects has the company completed?
- Who is the named project and service contact?
What Should I Ask about the Solar System Capacity and Design?
- Total solar-panel DC capacity
- Total inverter AC capacity
- DC-to-AC capacity ratio
- Number of solar panels
- Rated wattage of each panel
- Number of inverters
- Single-phase or three-phase design
- Proposed point of interconnection
- Maximum Demand used, where applicable
- Expected annual generation
- Expected self-consumption rate
- Expected export percentage
- Shading assumptions
- System-loss assumptions
- Annual degradation assumption
- Future expansion provisions
Why This Capacity?
Ask how electricity bills, daytime demand, roof area and programme limits support the proposed capacity.
What Capacity Is Contracted?
The agreement should distinguish panel DC capacity from inverter AC capacity.
What Capacity Will Be Submitted?
Confirm which capacity and equipment details will appear in the official application.
Can the Design Be Changed?
State when substitutions or capacity changes require the owner’s written approval.
What Equipment Questions Should Be Answered in the Contract?
| Equipment | Contract Details Required | Questions to Ask |
|---|---|---|
| Solar Panels | Manufacturer, exact model, quantity, wattage, product warranty and performance warranty | Can the installer substitute another model, and what approval is required? |
| Inverter | Manufacturer, exact model, AC capacity, quantity, monitoring and warranty period | Who removes and replaces the inverter if it fails? |
| Mounting System | Rail, clamp, fastener, roof attachment, corrosion protection and waterproofing method | Is the mounting workmanship covered if the roof leaks? |
| Electrical Protection | Breakers, isolators, surge protection, earthing, enclosures and labels | Are the protection arrangement and ratings shown in the design? |
| Cables and Connectors | Cable type, size, routing, containment, connector type and weather protection | Will compatible connectors and suitable cable support be used? |
| Monitoring System | Platform, data logger, account ownership, alerts, subscriptions and data access | Will the owner receive permanent administrator access? |
What Should the Solar Contract Include or Exclude?
| Project Item | Confirm in Writing |
|---|---|
| Site Assessment | Roof, shading, electrical installation and connection review |
| Engineering Design | Layout, single-line diagram, calculations and required endorsements |
| Application Work | Solar ATAP submission, responses, documents and application coordination |
| Technical Studies | Whether CCC, CAS, PSS or another assessment is required and included |
| Equipment Supply | All modules, inverters, mounting, protection and monitoring equipment |
| Installation | Labour, access equipment, cable routes, roof work and electrical work |
| Meter Work | Utility procedures, meter-board modification and separate charges |
| Testing and Commissioning | Tests, records, certificates and parties responsible |
| Handover | Manuals, drawings, serial numbers, warranties and monitoring access |
| After-Sales Support | Monitoring, inspection, fault response, maintenance and service charges |
- Scaffolding or lifting equipment
- Roof repair
- Roof reinforcement
- Waterproofing outside the solar work
- Main switchboard upgrades
- Meter-board upgrades
- Long cable runs
- Trenching or civil work
- Internet or communication devices
- Monitoring subscriptions
- Official application fees
- Technical-study fees
- Licensing fees
- Utility charges
- Taxes
- Future maintenance
What Should I Ask about Solar ATAP Applications and Approval?
- Is my project being submitted under Solar ATAP?
- Which company will be named as the RPVSP?
- Who will prepare and submit the application?
- Which documents must I provide?
- Which application fees are included in the contract?
- Does the proposed capacity require a technical study?
- Who appoints and pays the technical-study provider?
- What happens if the technical study allows a lower capacity?
- What happens if the application is incomplete?
- Who responds to SEDA or utility queries?
- What happens if the application is rejected?
- Is the deposit refundable if approval cannot be obtained?
- Can the installer change the design after approval?
- Who coordinates the applicable contract and meter process?
- Which approval must be obtained before installation begins?
- When is the project considered approved for payment purposes?
What Should I Ask about Roof Work and Installation Damage?
- Pre-installation roof photographs
- Existing-defect record
- Roof material and age
- Structural assessment requirement
- Mounting and penetration method
- Flashing and sealing method
- Corrosion protection
- Wind-load consideration
- Maintenance walkways
- Safe roof-edge clearance
- Drainage obstruction prevention
- Post-installation inspection
- Roof-leak response time
- Repair responsibility
- Workmanship exclusions
- Removal and reinstallation charges
What Should I Ask about the Installation Timeline?
| Timeline Stage | Questions to Ask |
|---|---|
| Contract Effective Date | Does the timeline begin at signing, deposit, document submission or application acceptance? |
| Application Period | Is the duration an estimate, and which delays are outside the installer’s control? |
| Equipment Procurement | Are the specified models reserved, and what happens if stock is unavailable? |
| Installation Date | How much notice will be provided and how long will the work take? |
| Testing and Commissioning | When will testing occur and what must be completed before final payment? |
| Meter and Commercial Operation | Is the completion date based on physical installation or full operational activation? |
| Delay Remedy | Can the customer cancel, obtain a refund or claim agreed remedies after an excessive delay? |
What Payment Questions Should I Ask before Signing?
- What is the total contract price?
- Is the price inclusive or exclusive of applicable taxes?
- Which official application fees are included?
- Which technical-study fees are excluded?
- Which utility or meter charges are excluded?
- How much deposit is required?
- What deliverable triggers each payment?
- Is any payment required before application approval?
- How much is payable before equipment delivery?
- Is there a retention amount until commissioning?
- What evidence must be provided before each invoice?
- What happens if equipment is unavailable?
- How are variation orders approved?
- Can the installer increase the contract price?
- What refund applies if the project cannot proceed?
- Are financing, early-settlement or late-payment charges applicable?
| Payment Stage | Possible Deliverable | What to Verify |
|---|---|---|
| Deposit | Contract execution and project commencement | Refund and cancellation conditions |
| Application Payment | Completed and submitted application | Submission evidence and included fees |
| Equipment Payment | Confirmed equipment order or site delivery | Model, quantity, ownership and storage risk |
| Installation Payment | Physical installation substantially completed | Inspection, defects and incomplete items |
| Final Payment | Testing, commissioning and complete handover | Operational status and required documents |
What Warranty and After-Sales Questions Should I Ask?
| Warranty Area | Questions to Ask |
|---|---|
| Panel Product Warranty | What defects are covered, who submits the claim and what costs are excluded? |
| Panel Performance Warranty | How is underperformance tested and what remedy is provided? |
| Inverter Warranty | Is diagnosis, transport, removal and replacement labour included? |
| Workmanship Warranty | What installation defects, wiring faults and roof leaks are covered? |
| Monitoring Support | Who monitors alerts and what happens when the system stops generating? |
| O&M Support | Are inspections, cleaning, reports or preventive maintenance included? |
| Response Time | Is there a written acknowledgement or site-visit target? |
| Installer Closure | What warranty documents and manufacturer contacts remain available if the installer stops operating? |
- Workmanship-warranty period
- Roof-leak coverage period
- Panel product warranty
- Panel performance warranty
- Inverter product warranty
- Mounting-system warranty
- Monitoring-equipment warranty
- Warranty registration responsibility
- Claim-submission responsibility
- Diagnostic charges
- Site-visit charges
- Transport charges
- Scaffolding charges
- Removal labour
- Reinstallation labour
- Expected service response
What Should I Ask about Cancellation, Termination and Disputes?
- Can I cancel before the application is submitted?
- Which costs are deducted from a refund?
- Can I cancel if the application is rejected?
- Can I cancel if only a lower capacity is approved?
- Can I reject an equipment substitution?
- What happens if the installer misses the agreed timeline?
- What constitutes a material breach?
- How much time is allowed to remedy defective work?
- Can the installer suspend work for a payment dispute?
- Who owns equipment already delivered to the site?
- What happens to unfinished applications after termination?
- Must the installer remove equipment after cancellation?
- Who pays for removal and roof restoration?
- What notice must be given before termination?
- How will disputes be escalated?
- Which law and jurisdiction govern the contract?
Which Documents Should Be Provided at Project Handover?
- Final system layout
- Final single-line diagram
- Approved application documents
- Testing and commissioning report
- Completion certification
- Panel model and serial numbers
- Inverter model and serial numbers
- Equipment datasheets
- Manufacturer warranty documents
- Workmanship warranty certificate
- Roof-work warranty information
- Monitoring administrator access
- Operating instructions
- Shutdown and emergency procedure
- Maintenance recommendations
- Service and warranty contacts
Final Checklist before Signing a Solar Contract
- Legal contracting company verified
- SSM details match the contract
- SEDA RPVSP status checked
- Electrical contractor identified
- Qualified technical personnel identified
- Exact panel models stated
- Exact inverter models stated
- DC and AC capacities stated
- Complete installation scope stated
- All exclusions listed
- Application responsibilities stated
- Official fees identified
- Technical-study responsibilities stated
- Roof condition documented
- Roof-damage responsibility stated
- Project timeline defined
- Completion definition stated
- Payment milestones defined
- Refund conditions stated
- Equipment-substitution process stated
- Workmanship warranty stated
- Warranty labour stated
- After-sales response stated
- Handover documents listed
What Is the Difference between Solar100 and the Solar Contractor?
| Solar100 | Solar Contractor or Service Provider |
|---|---|
| Provides general contract-comparison guidance | Prepares the project-specific quotation and agreement |
| Helps users compare participating providers | Assesses the property and electricity account |
| Highlights questions and possible contract gaps | Designs and specifies the proposed system |
| Does not prepare official engineering documents | Prepares or coordinates required technical documents |
| Does not submit the official application | Submits or coordinates the applicable application |
| Does not perform installation work | Performs or coordinates installation and commissioning |
| Does not issue equipment or workmanship warranties | Provides or coordinates contractual warranty obligations |
| Does not guarantee approval, savings or legal outcomes | Remains responsible for its written contractual commitments |
Frequently Asked Questions
Should the quotation and contract use the same company name?
Yes. The legal contracting entity, invoice issuer and payment recipient should be clearly identified and any differences should be explained.
Can the installer change the panel or inverter model?
The contract should state whether substitutions are allowed and require written owner approval for material equipment changes.
Should I pay the full solar price before installation?
Payment milestones should normally correspond with documented project progress, equipment delivery, installation, commissioning and handover.
What happens if Solar ATAP approval is not obtained?
The contract should state whether the project is revised, cancelled or refunded and which genuine costs may be deducted.
Does a panel or inverter warranty include labour?
Not automatically. Labour, transport, scaffolding, removal and reinstallation may be excluded unless the contract states otherwise.
Which promise is most important to put in writing?
Equipment specifications, project scope, payment triggers, roof responsibility, warranty labour, completion conditions and cancellation rights should all be written.