Should I Choose the Cheapest Solar Quotation?
The cheapest solar quotation may be suitable when it offers the same system capacity, equipment, engineering scope, installation quality, warranties and after-sales support as the alternatives. However, a lower total price may also result from a smaller inverter, lower-specification equipment, incomplete application work, shorter workmanship coverage, hidden exclusions or limited warranty support.
Is the Cheapest Solar Quotation Always the Best Choice?
No. The lowest quotation may be the best-value proposal, but only when its equipment, capacity, project scope, installation method, warranties and service obligations are properly documented and comparable with the other offers.
Shows the smallest amount payable under the quotation, but not necessarily the complete project cost.
Can help compare similar systems, but only where the equipment and scope are genuinely equivalent.
Considers price, output, reliability, warranty coverage, service and expected operating cost.
Why Can One Solar Quotation Be Much Cheaper?
Smaller System Capacity
The proposal may include fewer panels, a lower total panel capacity or a smaller inverter.
Different Equipment
The panels, inverter, monitoring equipment or protection devices may have different specifications and warranty terms.
Reduced Installation Scope
Roof access, cable work, meter-board modifications, application work or testing may be excluded.
Lower Labour Allowance
The quotation may allow less time for roof preparation, cable management, inspection, testing or finishing work.
Shorter Warranty Coverage
Workmanship, roof-leak, monitoring or service support may be covered for a shorter period.
Separate Additional Charges
Application fees, technical studies, scaffolding, transport or warranty labour may be charged later.
How Do You Make Solar Quotations Comparable?
Match the Capacity
Compare the same panel DC capacity and a comparable inverter AC capacity.
Match the Models
Record the exact panel, inverter, optimiser and monitoring equipment models.
Match the Scope
Confirm whether design, applications, studies, installation, testing and handover are included.
Add Excluded Costs
Include foreseeable official fees, structural work, meter work and installation variations.
Compare Warranty Liability
Check product, performance, workmanship, roof and warranty-labour responsibilities.
Compare Lifetime Value
Consider expected generation, downtime, service charges and equipment replacement risks.
How Should System Capacity Be Compared?
Two quotations may use similar wording while proposing different system sizes. Compare both the total solar-panel DC capacity and the total inverter AC capacity.
- Number of solar panels
- Wattage of each panel
- Total panel DC capacity
- Number of inverters
- Total inverter AC capacity
- DC-to-AC ratio
- Single-phase or three-phase design
- Usable roof area
- Expected annual generation
- Expected self-consumption
- Expected export percentage
- Future expansion allowance
| Quotation Difference | Why the Price May Be Lower | What to Check |
|---|---|---|
| Fewer panels | Lower equipment and installation cost | Total DC capacity and expected annual generation |
| Lower-wattage panels | Different panel specification or product generation | Exact model, efficiency, dimensions and warranty |
| Smaller inverter | Lower inverter cost | AC capacity, clipping assumptions and future expansion limitations |
| Different design | Less cable, fewer protection devices or simpler installation | Whether the design is technically suitable for the property |
How Should Equipment and Installation Materials Be Compared?
| Item | Details to Compare | Possible Cost Difference |
|---|---|---|
| Solar Panels | Manufacturer, exact model, power rating, efficiency, dimensions, product warranty and performance warranty | Different models may have different pricing, output density and warranty support |
| Solar Inverter | Manufacturer, exact model, AC rating, MPPT configuration, monitoring and warranty | A lower-cost inverter may differ in capacity, functions, support or warranty duration |
| Mounting System | Rail material, clamps, fasteners, roof attachments and corrosion protection | Material thickness, finish and attachment method can affect cost |
| Electrical Protection | Isolators, breakers, surge protection, earthing, enclosures and labels | Protection scope and component ratings may differ |
| Cables and Connectors | Cable type, size, routing, containment, connectors and weather protection | Cable length, containment and installation quality affect cost |
| Monitoring | Owner access, portal, alerts, meter, data logger and subscriptions | Basic monitoring may cost less than consumption and export monitoring |
Which Scope Differences Can Make a Quotation Look Cheaper?
- Site assessment
- Roof-condition inspection
- Structural review
- System layout
- Single-line diagram
- Engineering calculations
- Solar ATAP application
- Application response coordination
- Technical studies
- Official application fees
- Scaffolding or lifting equipment
- Roof repair or reinforcement
- Main switchboard modification
- Meter-board modification
- Long cable routes
- Internet or monitoring devices
- Testing and commissioning
- Complete handover documents
| Common Exclusion | Possible Later Cost | Question to Ask |
|---|---|---|
| Technical study | Study-provider and related technical charges | Is a CCC, CAS, PSS or other assessment required? |
| Roof work | Repair, reinforcement, waterproofing or replacement | What roof condition is assumed in the quotation? |
| Meter or switchboard work | Electrical modification and utility-related charges | Has the existing installation been inspected? |
| Scaffolding or lifting | Access and safety-equipment charges | Is all access equipment included in the fixed price? |
| Warranty labour | Diagnosis, transport, removal and reinstallation | Who pays these costs when equipment fails? |
Should the Highest Savings Estimate Win?
No. A high savings forecast does not necessarily mean the system provides better value. Compare the assumptions behind the estimated generation, self-consumption, exported electricity, tariff and payback period.
- Annual generation in kWh
- Solar-resource assumption
- Roof-orientation assumption
- Shading-loss assumption
- Temperature-loss assumption
- Soiling-loss assumption
- Inverter and cable losses
- System-availability assumption
- Annual degradation rate
- Self-consumption percentage
- Export percentage
- Electricity-tariff assumption
- Export-credit assumption
- Tariff-inflation assumption
- Maintenance-cost assumption
- Equipment-replacement assumption
Higher Generation Forecast
Check whether the proposal assumes lower losses, no shading or unusually high system availability.
Higher Savings Forecast
Check the electricity tariff, export value, self-consumption and tariff inflation used.
Shorter Payback Period
Confirm whether maintenance, downtime, financing and replacement costs are included.
Guaranteed Savings Claim
Ask whether the guarantee is contractual and which conditions or exclusions apply.
Can a More Expensive Quotation Provide Better Warranty Value?
Yes. A higher-priced proposal may include longer workmanship coverage, roof-leak responsibility, warranty registration, claim coordination, replacement labour or faster service commitments.
| Warranty Area | What to Compare |
|---|---|
| Panel Product Warranty | Period, defects covered, replacement basis and claim process |
| Panel Performance Warranty | Degradation schedule, testing requirements and remedy |
| Inverter Warranty | Period, extension, replacement procedure and local support |
| Workmanship Warranty | Installation defects, cable work, mounting and roof-leak coverage |
| Warranty Labour | Diagnosis, site visit, transport, scaffolding, removal and reinstallation |
| Service Commitment | Acknowledgement time, remote support and site-visit target |
How Should Payment Terms Affect the Decision?
A cheap quotation with a high upfront payment may expose the customer to more risk than a slightly higher quotation with payments linked to clear project milestones.
- Deposit amount
- Application-stage payment
- Equipment-order payment
- Delivery-stage payment
- Installation-stage payment
- Commissioning-stage payment
- Final retention amount
- Refund conditions
- Cancellation charges
- Variation-order approval
- Price-increase conditions
- Equipment-substitution terms
- Delay remedies
- Financing charges
- Late-payment charges
- Quotation-validity period
What Is the Lifetime Cost of a Solar System?
The purchase price is only the initial cost. Long-term value may also be affected by maintenance, cleaning, inverter replacement, monitoring fees, fault diagnosis, warranty labour, downtime and future removal or reinstallation.
What Are the Red Flags in an Unusually Cheap Solar Quotation?
- No exact legal company name
- Payment requested to an unrelated account
- No current SEDA RPVSP information
- No electrical contractor identified
- No qualified technical personnel identified
- No exact panel model
- No exact inverter model
- No DC and AC capacity distinction
- No roof inspection
- No electrical inspection
- No application scope
- No technical-study allowance
- No list of exclusions
- No workmanship warranty
- No roof-leak responsibility
- No warranty-labour explanation
- Nearly full payment required upfront
- Guaranteed approval or savings
Solar Quotation Value Comparison Table
| Comparison Category | Cheapest Quotation | Alternative Quotation | Decision Question |
|---|---|---|---|
| System Capacity | Is it the same DC and AC size? | Does it provide more usable capacity? | Are both proposals sized for the same load? |
| Equipment | Are exact models stated? | Are specifications or warranties stronger? | Does the difference justify the price? |
| Project Scope | Which services are excluded? | Which extra services are included? | What is the final complete-project cost? |
| Installation | What mounting and protection materials are used? | Is the installation method better documented? | Which proposal reduces roof and electrical risk? |
| Warranty | What labour and roof coverage is included? | Is support broader or longer? | What would a real claim cost the owner? |
| Payment | How much must be paid upfront? | Are milestones linked to delivery? | Which structure provides better customer protection? |
| After-Sales | Is service included or charged separately? | Are response commitments written? | Which provider is more likely to support the system? |
What Is the Difference between Solar100 and the Solar Provider?
| Solar100 | Solar Installer or Service Provider |
|---|---|
| Provides general quotation-comparison guidance | Prepares the project-specific proposal and price |
| Helps users compare participating providers | Assesses the electricity account and property |
| Highlights possible pricing and scope differences | Designs and specifies the proposed system |
| Does not determine the correct project price | Explains and supports its proposed pricing |
| Does not approve equipment or engineering design | Remains responsible for the equipment and design offered |
| Does not perform installation or commissioning | Performs or coordinates installation and commissioning |
| Does not issue equipment or workmanship warranties | Provides or coordinates applicable warranty obligations |
| Does not guarantee approval, generation or savings | Remains responsible for its written contractual commitments |
What Should I Ask before Choosing the Cheapest Quotation?
- Are all quotations based on the same total panel capacity?
- Are all quotations based on a comparable inverter capacity?
- What are the exact panel and inverter models?
- Why is this quotation cheaper than the others?
- Which services are excluded from the price?
- Which official fees must I pay separately?
- Are technical-study fees included?
- Are scaffolding and access equipment included?
- Are roof repairs or reinforcement excluded?
- Are meter and switchboard modifications included?
- What annual generation is estimated?
- Which losses are included in the forecast?
- What self-consumption and export rates are assumed?
- What does the workmanship warranty cover?
- Who is responsible if the roof leaks?
- Who pays labour for equipment warranty claims?
- What after-sales response is included?
- What payment is required before equipment delivery?
- What happens if the application is rejected?
- What happens if specified equipment is unavailable?
What Should You Prepare for a Fair Quotation Comparison?
- All written solar quotations
- Recent TNB electricity bills
- Domestic or non-domestic tariff
- Single-phase or three-phase supply
- Maximum Demand, where applicable
- Proposed panel capacity
- Proposed inverter capacity
- Panel datasheets
- Inverter datasheets
- Equipment warranty documents
- Workmanship warranty terms
- Roof photographs
- Proposed system layout
- List of included services
- List of excluded items
- Payment schedule
- Project timeline
- After-sales service terms
Frequently Asked Questions
Is the cheapest solar quotation always bad?
No. It may offer good value if the capacity, equipment, project scope, installation quality, warranties and support are genuinely comparable.
Can I compare solar quotations using price per kW?
Yes, but only after confirming that the inverter capacity, equipment, installation scope, fees, warranties and service coverage are comparable.
Why is one solar quotation much cheaper?
It may include a smaller system, different equipment, fewer services, more exclusions, shorter warranties or separate additional charges.
Should I choose the quotation with the shortest payback?
Not automatically. Check whether its generation, tariff, self-consumption, export, maintenance and replacement assumptions are realistic.
What is the most important quotation exclusion?
There is no single exclusion for every project. Technical studies, roof work, meter work, switchboard upgrades and warranty labour can all create significant additional costs.
How many solar quotations should I compare?
Comparing at least three written proposals can help reveal differences in sizing, equipment, scope, assumptions, warranties and payment terms.
Compare Your Solar Quotations before Choosing